Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Osaero Job Work For Manufacturing Of 02 Parts As A Package Ref Semfg458
|
| Description |
|
| Organisation | Department of Defence Production | Ministry of Defence |
| Tender Id | GEM/2024/B/5157385 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | July 13, 2024 16:13 |
| End Date |
Expired
03/08/2024
Expired 803 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | AEROSPACE ENGINEERS PRIVATE LIMITED | Make : OEM Model : OSAERO JOB WORK FOR MANUFACTURING OF 2 PARTS Title : OSAERO JOB WORK FOR MANUFACTURING OF 2 PARTS | 03-08-2024 15:19:44 | MII MSE | Qualified |
| 2 | MAULI INDUSTRIES | Make : MAULI Model : AERO PARTS LCA Title : AERO PARTS LCA | 02-08-2024 19:39:53 | MII MSE | Qualified |
| 3 | Omega Engineers and Manufacturers | Make : Omega Engineers And Manufacturers Model : OSAERO JOB WORK FOR MANUFACTURING OF 02 PARTS AS A Title : OSAERO JOB WORK FOR MANUFACTURING OF 02 PARTS AS A PACKAGE REF SEMFG458 | 03-08-2024 14:12:59 | MII MSE | Qualified |
| 4 | SOFTEC SERVICES | Make : SOFTEC Model : OSAERO JOB WORK FOR MANUFACTURING OF 02 PARTS AS A Title : OSAERO JOB WORK FOR MANUFACTURING OF 02 PARTS AS A PACKAGE REF SEMFG458 | 02-08-2024 17:32:12 | MII MSE | Qualified |
| 5 | UNITED COMPOSHEETS PRIVATE LIMITED | Make : UCPL Model : UCPL Title : Machining | 29-07-2024 20:22:45 | MII MSE | Qualified |
Manufacturing / fabrication and supply of mechanical spare parts required for jammu ropeway project (indian make).
Manufacturing / fabrication and supply of mechanical spare parts required for jammu ropeway project (indian make).
Read moreFacility management services - lumpsum based - job contract for manufacturing of ash bricks from semi-automatic machine for part b at vstps job contract for manufacturing of ash bricks from semi-automatic machine for part b at vstps consumables to ..
Facility management services - lumpsum based - job contract for manufacturing of ash bricks from semi-automatic machine for part b at vstps job contract for manufacturing of ash bricks from semi-automatic machine for part b at vstps consumables to ..
Read moreDesign, engineering, manufacturing, supply, testing, erection and commissioning for dcs package for hbl lauriya, west champaran, bihar.
Design, engineering, manufacturing, supply, testing, erection and commissioning for dcs package for hbl lauriya, west champaran, bihar.
Read moreDesign engineering manufacturing supply supervision for erection and commissioning of jet cooker package for hbl sugauli east champaran bihar
Design engineering manufacturing supply supervision for erection and commissioning of jet cooker package for hbl sugauli east champaran bihar
Read moreDesign, engineering, manufacturing, supply, supervision for erection and commissioning of jet cooker package for hbl lauriya, west champaran, bihar
Design, engineering, manufacturing, supply, supervision for erection and commissioning of jet cooker package for hbl lauriya, west champaran, bihar
Read more2nd time manufacturing of iron tree guards including material and all allied job works i.e paint and name plate stencil printing for the year 2026-27
2nd time manufacturing of iron tree guards including material and all allied job works i.e paint and name plate stencil printing for the year 2026-27
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit complete overhauling of c1 compressor (2mcl805-4) and c2 compressor (2mcl456) of process air compressor for job-i as per sow,repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit complete overhauling of ammonia refrigeration compressorc1 compressor (mcl 453) and c2 compressor (2mcl 456) for job-ii as per sow
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit complete overhauling of c1 compressor (2mcl805-4) and c2 compressor (2mcl456) of process air compressor for job-i as per sow,repair, maintenance, and installation of plant/ systems/equipments (version 2) - manufacturing unit complete overhauling of ammonia refrigeration compressorc1 compressor (mcl 453) and c2 compressor (2mcl 456) for job-ii as per sow
Read moreDesign, engg, manufacturing, supply, installation and commissioning of acvs (hvac) system in connection with upgradation of billet casters i and ii at ccp main package (pkg-i)
Design, engg, manufacturing, supply, installation and commissioning of acvs (hvac) system in connection with upgradation of billet casters i and ii at ccp main package (pkg-i)
Read moreRubber kit for 1.1/4 cut- off angle cock with vent as per clw drg. no 0/2/65/386 alt.6 ref- 12 &13 (02 items 03 nos.)consisting (i) o ring (ref-12)01 no.(ii)sealing washer (ref.-13)- 02 nos ( this is for shelf life items and should be procured with staggered delivery period. supplier to mention / print date of manufacturing on the item & to be supplied within 90 days of manufacture date.)
Rubber kit for 1.1/4 cut- off angle cock with vent as per clw drg. no 0/2/65/386 alt.6 ref- 12 &13 (02 items 03 nos.)consisting (i) o ring (ref-12)01 no.(ii)sealing washer (ref.-13)- 02 nos ( this is for shelf life items and should be procured with staggered delivery period. supplier to mention / print date of manufacturing on the item & to be supplied within 90 days of manufacture date.)
Read moreAnnual maintenance services for water purification and conditioning system (version 2) - ro plant upto 3 package-5 : water purifier and conditioning system maintenance involving basic servicing, filters, membranes, all electrical parts including pu..,annual maintenance services for water purification and conditioning system (version 2) - water cooler upto 3 package-5 : water purifier and conditioning system maintenance involving basic servicing, filters, membranes, all electrical parts includin..
Annual maintenance services for water purification and conditioning system (version 2) - ro plant upto 3 package-5 : water purifier and conditioning system maintenance involving basic servicing, filters, membranes, all electrical parts including pu..,annual maintenance services for water purification and conditioning system (version 2) - water cooler upto 3 package-5 : water purifier and conditioning system maintenance involving basic servicing, filters, membranes, all electrical parts includin..
Read moreof your Industry type