Tender Details
About Tender
🛣️ Invitation For Bids: Kamari Waghi Road Improvement Project 🛣️ Rdd Ceo Nanded, A State Government Entity, Invites Bids For The Improvement Of Kamari Waghi Road From Km 0/00 To 1/00, Vr 49 Tq. Himayatnagar. 📅 Bid Submission Deadline: July 19, 2024, 5:00 Pm Tender Fee: Inr 1180 Emd: Inr 100,000 This Project Aims To Enhance The Infrastructure And Connectivity In The Region. Interested Contractors Must Submit Detailed Bids, Including Technical Specifications, Cost Estimates, And Project Timelines, In Accordance With The Tender Documents. Keywords: Road Improvement, Infrastructure Development, Kamari Waghi Road, Himayatnagar, Rdd Ceo Nanded, State Government, Tender, Bid SubmissionParticulars | Details |
---|---|
Title |
Improvement To Sh 263 To Pawanmari Road Vr 32 Km. 0/00 To 4/00 Tq. Himayatnagar Dist. Nanded.
|
Description |
Improvement To Sh 263 To Pawanmari Road Vr 32 Km. 0/00 To 4/00 Tq. Himayatnagar Dist. Nanded.
|
Organisation | RDD-CEO-NANDED | State Govt. and UT |
Tender Id | 2024_NANDE_1048378_1 |
Reference Number |
ZPN/WD/Bhokar/e.TEN 33/OPEN/23-24 |
Tender Fee | 1180 |
EMD | 1.5 Lakh |
Tender Value | |
Place | IMPROVEMENT TO SH-263 TO PAWANMARI ROAD VR-32 KM. |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1836527 |
Start Date | July 12, 2024 14:30 |
End Date |
19/07/2024 ( Expired 305 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreRehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreRenewal/strengthening work from chala to sikar (km. 64/00 to 122/00) sh 37 b on kotputli sikar kuchaman road (sh 37b, sh 8a, mdr 24, sh 07)
Renewal/strengthening work from chala to sikar (km. 64/00 to 122/00) sh 37 b on kotputli sikar kuchaman road (sh 37b, sh 8a, mdr 24, sh 07)
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read morePr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Pr of road from dafidar para baily bridge to saudiram para bailey bridge via abhicharan bazar during the year 2024-25/sh wbm-iii, carpeting, drain and earth filling etc(l-3.20 km).
Read moreStrengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreof your Industry type