Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mid Life Overhaul (Mloh) Of Jcb 3 Dx (Super)
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2023/B/4011377 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | September 26, 2023 20:43 |
| End Date |
Expired
17/10/2023
Expired 1095 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | EMD Status | MSE/MII Status | Status |
|---|---|---|---|---|---|---|
| 1 | GAUTAM ENGINEERING CO | Make : JCB INDIA LIMITED Model : MID LIFE OVERHAUL OF JCB SUPER MACHINE Title : MID LIFE OVERHAUL OF JCB SUPER MACHINE | 15-11-2023 18:23:08 | Offline upload | MII | Qualified |
| 2 | JCB INDIA LIMITED | Make : JCB Model : MLO of JCB 3DX Super Title : MLO of JCB 3DX Super | 15-11-2023 17:17:24 | Turnover >= 500 Cr. | MII N/A | Qualified |
| 3 | Moni Enterprises | Make : NA Model : MID LIFE OVERHAUL (MLOH) OF JCB 3DX Title : MID LIFE OVERHAUL (MLOH) OF JCB 3DX | 16-11-2023 04:58:23 | Offline upload | MII | Disqualified |
Engine testing of jcb 3dx super,hydraulic system testing of jcb 3dx super,repair of fuel injection pump of jcb 3dx super,repair of nozzle and turbo charger of jcb 3dx super,repair of starter motor and alternator of jcb 3dx super
Engine testing of jcb 3dx super,hydraulic system testing of jcb 3dx super,repair of fuel injection pump of jcb 3dx super,repair of nozzle and turbo charger of jcb 3dx super,repair of starter motor and alternator of jcb 3dx super
Read moreEngine assembly of excavator loader jcb 3dx super
Engine assembly of excavator loader jcb 3dx super
Read moreRate contract for hiring of jcb machine (3dx or equivalent)
Rate contract for hiring of jcb machine (3dx or equivalent)
Read moreFuel feed pump jcb 3dx,hydraulic pipe jcb,radiator hose,hydraulic pressure pipe,wheel brake repair kit,4x4 solonoid
Fuel feed pump jcb 3dx,hydraulic pipe jcb,radiator hose,hydraulic pressure pipe,wheel brake repair kit,4x4 solonoid
Read moreMid life rehabilitation (mlr) of 150 lhb coaches as per scope of work.
Mid life rehabilitation (mlr) of 150 lhb coaches as per scope of work.
Read moreCorrosion and air brake activities for mid-life rehabilitation (mlr) of 50 lhb coaches at carriage repair shop, tirupati
Corrosion and air brake activities for mid-life rehabilitation (mlr) of 50 lhb coaches at carriage repair shop, tirupati
Read moreIefuelfilter eleme-a-1b,anabond big 100gm,bolt m16 x 120 g 10.9,bolt m16 x 140 g 10.9,elementfuelsedimentorfilter 30 miccron,gasket jcb super plate,gasket xxxv a,gasket drain pipe to rurbo,gasket inlet manifold,gasket water inlet pipe,nut lock gr-m16,nut m8 flange head,o ring,o ring jcb super plate xxxix a,push rod lp fuel pump,reman long block 444,resilient mount,screw m12 x 35 countersunk head,snapring leaf off rail,switch oil pressure,lift pump diesel
Iefuelfilter eleme-a-1b,anabond big 100gm,bolt m16 x 120 g 10.9,bolt m16 x 140 g 10.9,elementfuelsedimentorfilter 30 miccron,gasket jcb super plate,gasket xxxv a,gasket drain pipe to rurbo,gasket inlet manifold,gasket water inlet pipe,nut lock gr-m16,nut m8 flange head,o ring,o ring jcb super plate xxxix a,push rod lp fuel pump,reman long block 444,resilient mount,screw m12 x 35 countersunk head,snapring leaf off rail,switch oil pressure,lift pump diesel
Read moreTtps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Ttps mech ii bm unit iii boiler cleaning of i pass furnace ii pass and boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater and matching of reconditioned tips during the 2026 2
Read moreof your Industry type