Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Renovation Of Constructed Sports Infrastructure And Construction Of 03 Nos Female/03 Nos Male Toilet With Boundary Wall At Sports Stadium District Unnao (U.P.)
|
Description |
Renovation Of Constructed Sports Infrastructure And Construction Of 03 Nos Female/03 Nos Male Toilet With Boundary Wall At Sports Stadium District Unnao (U.P.)
|
Organisation | U.P. Projects Corporation Ltd. | State Govt. and UT |
Tender Id | 2025_UPPRC_1006092_1 |
Reference Number |
65/UPPCL/GM-7/E-TENDER/2024-25 Dated-13.02.2025 |
Tender Fee | 17700 |
EMD | 25.25 Lakh |
Tender Value | |
Place | Sports Stadium District-Unnao (U.P.) |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1800744 |
Start Date | February 14, 2025 16:30 |
End Date |
24/02/2025 ( Expired 112 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreRenovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Renovation work of building and construction of boundary wall at samajik chetna kendra near mangal bhavan ward no. 55 file no. 154/25x3/3
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read more2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
2nd call for construction installation trial run and commissioning of three nos desiccant de humidification system for 200 mt capacity de humidified godown based on paddy at tepania under gomati district ad nagar under west tripura district and telia
Read moreSpecial repair/ renovation of staff qtrs, boundary wall, store room, assembly shed and other allied services of kv no 4 under age b/r-v and age e/m-v of ge (n) bathinda at bathinda mil stn
Special repair/ renovation of staff qtrs, boundary wall, store room, assembly shed and other allied services of kv no 4 under age b/r-v and age e/m-v of ge (n) bathinda at bathinda mil stn
Read moreConstruction of boundary wall and allied infrastructure at harishchandrapuram in nw4 on epc mode schedulea
Construction of boundary wall and allied infrastructure at harishchandrapuram in nw4 on epc mode schedulea
Read moreEnabling works and construction of boundary wall at additionally purchased land at sv 18 mashkal, maharashtra
Enabling works and construction of boundary wall at additionally purchased land at sv 18 mashkal, maharashtra
Read moreZone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.
Zone no. 01, ward no. 04, construction of boundary wall of park and development of park in front of union bank at vindhya vihar colony.
Read moreConstruction of central prison, 113 nos. of prison staff quarters, cement concrete road and security perimeter wall (for men prison) at therkkutheru utkadai sembur village, melur taluk in madurai district (phase-i)
Construction of central prison, 113 nos. of prison staff quarters, cement concrete road and security perimeter wall (for men prison) at therkkutheru utkadai sembur village, melur taluk in madurai district (phase-i)
Read moreof your Industry type