Tender Details
Particulars | Details |
---|---|
Title |
Tn 13307 Supply Of Water Separator With Mechanical Automatic Drainage For Unit 1 To 7, Kstps, Kota.
|
Description |
Supply Of Water Separator With Mechanical Automatic Drainage For Unit 1 To 7, Kstps, Kota.
|
Organisation | RRVUN - CMD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 1090 |
EMD | 33780 |
Tender Value | |
Place | Kota Super Thermal Power Station |
Link |
AAAAAAAAAA Login to view |
Start Date | March 28, 2025 17:30 |
End Date |
25/04/2025 ( 4 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Supply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreDevelopment of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode
Read moreConsultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Consultancy services for ae for supervision of rehabilitation and upgradation from of kolde to visarwadi (near junction with nh-6) section of nh752g (total length -4.40) to 2lps/ four lanes in the state of maharashtra on epc mode.
Read moreSupply of 38 nos. airfield crash fire tender (acfts) / aircraft rescue and fire fighting vehicles (arffvs) of 10,000 liters water tank capacity with 08 years comprehensive annual maintenance contract after 02 years of defect liability period
Supply of 38 nos. airfield crash fire tender (acfts) / aircraft rescue and fire fighting vehicles (arffvs) of 10,000 liters water tank capacity with 08 years comprehensive annual maintenance contract after 02 years of defect liability period
Read moreConsultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Consultancy services of ae for construction of 6-lane patna ring road highway nh-131g from kanhauli to sherpur from km.0.000-km8.480 including junction development with bihta-danapur elevated corridor app.length-1.5 km on epc mode in bihar l-9.98km
Read moreHiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Hiring of model- 25/latest model of 1 no. omni bus/traveler (t-2), 25-1 seating capacity or equivalent sel vehicle for utilization period of bus up to 03 years or 2,50,000 kms for ae(tlm) sub dn., mpptcl, satna
Read moreConsultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system (sle, sc and ccs) for phase-2a and 2b and integration with existing afc system
Read moreof your Industry type