Tender Details
Particulars | Details |
---|---|
Title |
Selection Of Contractor For The Work Of Legacy Waste Dumpsite Remediation Through Bioremediation,Biomining And Disposal Of Residual Waste In Nagar Palika Parishad Agar
|
Description |
Selection Of Contractor For The Work Of Legacy Waste Dumpsite Remediation Through Bioremediation,Biomining And Disposal Of Residual Waste In Nagar Palika Parishad Agar
|
Organisation | Directorate Urban Administration and Development | State Govt. and UT |
Tender Id | 2025_UAD_415529_1 |
Reference Number |
1422-09.04.2025 |
Tender Fee | 10797 |
EMD | 50700 |
Tender Value | |
Place | AGAR MALWA |
Link | https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=489912 |
Start Date | April 10, 2025 15:30 |
End Date |
09/05/2025 ( Expired 4 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Selection of green hydrogen producers for setting up green hydrogen production facilities anchor unit and experimental anchor units in the state under maharashtra green hydrogen policy 2023
Read moreOperation work of deendayal rasoi center in nagar palika parishad damua
Operation work of deendayal rasoi center in nagar palika parishad damua
Read moreConsultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreWard-58 construction work of drain and cc road on shanti vatika road in chandan nagar gulaab nagar.
Ward-58 construction work of drain and cc road on shanti vatika road in chandan nagar gulaab nagar.
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreConstruction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Construction of balance work of widening and strengthening for improvement and up-gradation of nh-709a garhmukteshwar chainage- 83.200 of nh24 to meerut (chainage 9.860 of nh235) including connector to nh-119 package xii in uttar pradesh on epc mode.
Read moreSelection of agency for conducting solid waste management activities and creating awareness to make
Selection of agency for conducting solid waste management activities and creating awareness to make&#x0d singrauli city a garbage free city a in all wards of smc
Read moreDevelopment of integrated solid waste management (collection, transportation, processing and disposal) for municipal corporation amritsar, territory (1), through public private partnership
Development of integrated solid waste management (collection, transportation, processing and disposal) for municipal corporation amritsar, territory (1), through public private partnership
Read moreConstruction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Construction of retaining wall and excavation work in the east and west direction of badhiya talab in kamla nagar ward 3. length 67.65 m, width 60 m
Read moreof your Industry type