Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Consultancy Service For Authoritys Engineer For Supervision Of Construction Of Two Lane To Four Lane Road With Paved Shoulder From Mangalwar Km. 0/00 To 37/225 Nimbahera Junction Nh 56 (Total Length 37.225 Km) Major District Road(mdr11
|
| Description |
Procurement Of Consultancy Service For Authoritys Engineer For Supervision Of Construction Of Two Lane To Four Lane Road With Paved Shoulder From Mangalwar Km. 0/00 To 37/225 Nimbahera Junction Nh 56 (Total Length 37.225 Km) Major District Road(mdr11
|
| Organisation | RSRDCC-GM | State Govt. and UT |
| Tender Id | 2025_RSRDC_524365_1 |
|
Reference Number |
RSRDC NIT No. 607/2025-26 Dated 30.12.2025 |
| Tender Fee | 4360 |
| EMD | 4.83 Lakh |
| Tender Value | - |
| Place | District Chittorgarh |
| Link |
View Original Tender Notice
https://eproc.rajasthan.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=935654 |
| Start Date | January 05, 2026 16:30 |
| End Date |
Expired
21/01/2026
Expired 268 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode
Consultancy services for authoritys engineer for supervision of widening of existing 2 lane to 4 lane with paved shoulder from km. 32.950 to km. 55.400 (thavar to jherda section) of nh 168a in the state of gujarat on epc mode
Read moreConsultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m
Consultancy services for authoritys engineer for supervision of balance work of the rehabilitation and upgradation from km 33.860 to km 67.150 of the naldurge to akkalkot section of nh 652 to 2 lane with paved shoulder configuration in the state of m
Read moreConsultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Consultancy services for authoritys engineer for supervision of the work of construction of 4-lane with paved shoulder of sri muktsar sahib bypass from existing km 269.960 of nh-354 to existing km 39.280 of nh - 754 in the state of punjab.
Read moreConsultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Consultancy services for preparation of dpr for widening to four lane with paved shoulder from two lane with paved shoulder from km.0.00 to km.118.470 kalaburagi wadi yadgiri kadechur section of nh 150 in the state of karnataka
Read moreBalance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Balance work of umaria shahdol 2-lane with paved shoulder road project in the state of madhya pradesh
Read moreConsultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Consultancy services for preparation of dpr for i widening upgradation to two lane with paved shoulder on nh 169a from km. 30.75 to km. 51.60 agumbe ghat, ii construction of two lane with paved shoulder for thirtahalli bypass starts on from nh169a
Read moreConst. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Const. of cc rd frm indore naka to station bridge via ganesh mandir chouraha, sugar factory chouraha, lunia chourha,railway bridge 2 lane with paved shoulder frm ch.0 to 1.700 l 1.70 km n 4 lane with paved shoulder frm ch.1.800 to 4.300 l.2.50 km
Read moreUpgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Upgradation of existing two- lane with paved shoulders carriageway of nagaur-bikaner section of nh-62 from design km 161/000 to km 270/245 to four lane with paved shoulder in state of rajasthan on bot (toll) mode
Read moreWidening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Widening of existing 2 lane to 4 lane with paved shoulder from km 32.950 to km 55.400 (thavar to zerda section of nh-168a in the state of gujarat on epc mode.
Read moreWidening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Widening and strengthening of existing 2 lane to 2 lane with paved shoulder from km. 205.373 to km. 311.700 of nh-326 in the state of odisha under epc mode (package-2)
Read moreof your Industry type