Tender Details
Particulars | Details |
---|---|
Title |
General Sabarimala Festival 2024 25 (Upgradation With Bm And Bc 7.125 Km)improvements To Alummavu Kuroor Road From Ch.0/000 To 4/625 And Mp Varghese Road From Ch.0/000 To 2/500 By Providing Bm And Bc Works General Civil Work 1
|
Description |
Clearing, Filling Up Pot Holes, Gsb, Wmm , Bm, Bc, Interlocking Tile,Drain And Irish Drain , Dry Rubble Masonry, P.C.C, Rcc Raft Foundation, Abutment, Wingwall, Parapets Slab Are Provided For Culvert Construction, Traffic Safety Measures Works
|
Organisation | PWD | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 13010 |
EMD | 2 Lakh |
Tender Value | |
Place | Ernakulam Kothamangalam |
Link |
AAAAAAAAAA Login to view |
Start Date | May 17, 2025 23:30 |
End Date |
30/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to 2l with ps in the state of madhya pradesh on epc mode
Read moreRehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Rehabilitation and upgradation of sendhwa to khetiya (mp/mh border) section from km 0/000 to km 55/600 of nh-752(g) to two lane with paved shoulders in the state of madhya pradesh on epc mode.
Read moreProviding and laying of wmm 7.5 cm, dbm 7.5 cm and bc 4.00 cm including cleaning of road surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 10 to km 20 on road ramdevra-nachna under 95 rcc/45 brtf
Providing and laying of wmm 7.5 cm, dbm 7.5 cm and bc 4.00 cm including cleaning of road surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 10 to km 20 on road ramdevra-nachna under 95 rcc/45 brtf
Read moreProviding and laying of wmm 7.5 cm, dbm 6.00 cm and bc 4.00 cm including cleaning of rd surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 0 km 30 on road pithewala-kalibuli-bahla under 96 rcc/45 tf
Providing and laying of wmm 7.5 cm, dbm 6.00 cm and bc 4.00 cm including cleaning of rd surface, applying prime and tack coat and road marking 2.5 mm thick for surfacing works from km 0 km 30 on road pithewala-kalibuli-bahla under 96 rcc/45 tf
Read morePr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k
Pr of road from machmara kumarghat kn road to south dhanicherra panchyet office road via parbojay para awc during the year 2025 2026 total length 0 800 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 900 k
Read morePr of road from pecharthal kanchanpur road to pecharthal kanchanpur via machmara market during the year 2025 2026 total length 0 820 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 820 km
Pr of road from pecharthal kanchanpur road to pecharthal kanchanpur via machmara market during the year 2025 2026 total length 0 820 km sh patch solling patch mettaling carpeting and seal coat work from ch 0 00 km to 0 820 km
Read moreRehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Rehabilitation upgradation to four lane road with paved shoulders length in buldhana city from km.52.450 to km. 54.470 (total length 2.02 km) and reconstruction of mnb at ch 80.170 ch 89.610 ch 93.310 ch 96.750 of buldhana khamgaon section (ch 52.450
Read moreGeneral sabarimala festival work 2022 23 improvements to manipuzha peringara road 0.000 to 1.000 and moovadathupady mepral road 0.000 to 3.140 general civil work.
General sabarimala festival work 2022 23 improvements to manipuzha peringara road 0.000 to 1.000 and moovadathupady mepral road 0.000 to 3.140 general civil work.
Read moreWidenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Widenning and strenthening of existing road from 3.75 to 10.00 mtr of approach road from tunkara -balara- rabriyawas to nh-158/sh-39 (ras merta highway) km 0/0 to 11/000
Read moreGeneral budget work 2024 25. upgradation providing bm and bc to kadapra veeyapuram road ch.4.350 to 8.000 general civil work
General budget work 2024 25. upgradation providing bm and bc to kadapra veeyapuram road ch.4.350 to 8.000 general civil work
Read moreof your Industry type