Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Cc Flooring In Front Of Non Trauma Casualty In Scbmch, Cuttack For The Year 2025 26
|
| Description |
Construction Of Cc Flooring In Front Of Non Trauma Casualty In Scbmch, Cuttack As Per Dmeto Lr. No. 20423 Dt. 25.09.2025 Buildings.
|
| Organisation | EIC-CIVIL | State Govt. and UT |
| Tender Id | 2025_EICCL_121200_1 |
|
Reference Number |
SE CTC (RandB)-50 of 2025-26 |
| Tender Fee | 4000 |
| EMD | 9300 |
| Tender Value | - |
| Place | Cuttack |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=563891 |
| Start Date | November 13, 2025 20:30 |
| End Date |
Expired
25/11/2025
Expired 327 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Improvement of casualty front internal road cum drain starting from m.k.c.g. main road to oandg building at mkcg medical college and hospital at berhampur buildings.
Improvement of casualty front internal road cum drain starting from m.k.c.g. main road to oandg building at mkcg medical college and hospital at berhampur buildings.
Read moreNon-flammable solvent based adhesive for pasting flexible pvc flooring material to stainless steel
Non-flammable solvent based adhesive for pasting flexible pvc flooring material to stainless steel
Read moreConstruction of large shed and flooring in front of shrine inside sainik school campus in ward no. 12
Construction of large shed and flooring in front of shrine inside sainik school campus in ward no. 12
Read moreDplan vitrified flooring and pvc downceiling of hall in front of school in vill. barnala block ambala-ii
Dplan vitrified flooring and pvc downceiling of hall in front of school in vill. barnala block ambala-ii
Read moreGrinding and polishing of existing kota stone flooring at 17.0 mtr. tg floor in front of main control room, csctpp, chhabra
Grinding and polishing of existing kota stone flooring at 17.0 mtr. tg floor in front of main control room, csctpp, chhabra
Read moreFlooring in wcc/ddu i.e. dv lab, sab room, boxn store near front gate of boxn store & general store and bd section.
Flooring in wcc/ddu i.e. dv lab, sab room, boxn store near front gate of boxn store & general store and bd section.
Read moreStripping and fitment of modular lavatories and compreg flooring in lhb ac and non ac coaches and icf coaches at lw/per through open tender
Stripping and fitment of modular lavatories and compreg flooring in lhb ac and non ac coaches and icf coaches at lw/per through open tender
Read moreAssy oil filter,assy kit lined shoe rear,kit pad assy front,cover timing,speedo cable,door glass,hose assy,hose non metalic
Assy oil filter,assy kit lined shoe rear,kit pad assy front,cover timing,speedo cable,door glass,hose assy,hose non metalic
Read moreHose radiator to elbow,hose non metallic,system protection valve rep kit,tapper roller brg front hub,starter motor 24 volt,rubber hose,clutch cleeve cyl
Hose radiator to elbow,hose non metallic,system protection valve rep kit,tapper roller brg front hub,starter motor 24 volt,rubber hose,clutch cleeve cyl
Read moreProviding and fixing kota stone flooring at outer pessage of new and old wing hostel buildings (both sides front and back) of ug hostel in home science college in sector 10 chandigarh
Providing and fixing kota stone flooring at outer pessage of new and old wing hostel buildings (both sides front and back) of ug hostel in home science college in sector 10 chandigarh
Read moreof your Industry type