Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛣️ Bid Invitation For Highway Infrastructure Upgrade 🛣️ The National Highways Authority Of India (Nhai) Is Seeking Bids For The Significant Up Gradation Of A 2 Lane Highway To A 4 Lane At Grade Road With The Addition Of A 4 Lane Elevated Flyover From Talegaon To Shikrapur On Nh 548 D, Spanning 25 Kilometers In Maharashtra. This Project Is To Be Developed On A Build Operate Transfer (Bot) Basis With Tolling Rights. 📅 Bid Submission Deadline: June 14, 2024, 11:00 Am Tender Fee: Inr 2,50,000 Earnest Money Deposit (Emd): Inr 24,56,00,000 Interested Bidders Must Possess The Requisite Expertise In Highway Infrastructure Development And Submit Detailed Proposals, Including Financial Bids, Technical Specifications, And Project Execution Plans, In Accordance With The Project's Scope And Nhai Guidelines. Keywords: Highway Upgrade, Infrastructure Development, Bot, Toll, National Highways Authority Of India, Elevated Flyover, Nh 548 D, Maharashtra, Emd, Tender, Bidding| Particulars | Details |
|---|---|
| Title |
Up Gradation Of Existing 2 Lanes Highway To 4 Lane At Grade With Cons. Of 4 Lane Elevated Flyover (Talegaon Chakan Shikrapur Of Nh 548 D (From Km. 0.000 To Km. 25.000 (Design Length 25.000 Km)) In Maharashtra To Be D On Bot (Toll)mode (Pkg 1)
|
| Description |
Up Gradation Of Existing 2 Lanes Highway To 4 Lane At Grade With Cons. Of 4 Lane Elevated Flyover (Talegaon Chakan Shikrapur Of Nh 548 D (From Km. 0.000 To Km. 25.000 (Design Length 25.000 Km)) In Maharashtra To Be D On Bot (Toll)mode (Pkg 1)
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_178858_1 |
|
Reference Number |
- |
| Tender Fee | 2.5 Lakh |
| EMD | 24.56 Crore |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=195707 |
| Start Date | December 21, 2023 22:30 |
| End Date |
Expired
17/09/2024
Expired 739 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Up-gradation of existing 2 lanes highway to 4 lane at grade with cons. of 4 lane elevated flyover (talegaon chakan shikrapur of nh-548d (25.000 to km. 53.200 (design length 28.000 km)) in maharashtra to be d on bot (toll) mode (pkg-2)
Up-gradation of existing 2 lanes highway to 4 lane at grade with cons. of 4 lane elevated flyover (talegaon chakan shikrapur of nh-548d (25.000 to km. 53.200 (design length 28.000 km)) in maharashtra to be d on bot (toll) mode (pkg-2)
Read moreShort term maintenance to talegaon chakan shikan shikrapur nhavara adhalgaon jamkhed road nh 548d km 95.140 to 95.930 102.110 to 102.950 and 126.400 to 126.500 section nhavara to adhalgaon
Short term maintenance to talegaon chakan shikan shikrapur nhavara adhalgaon jamkhed road nh 548d km 95.140 to 95.930 102.110 to 102.950 and 126.400 to 126.500 section nhavara to adhalgaon
Read moreShort term maintainance contract to nh -548 d talegaon chakan shikrapur nhavara section shikrapur to nhavara km 54.00 to 79.00 in the state of maharashtra
Short term maintainance contract to nh -548 d talegaon chakan shikrapur nhavara section shikrapur to nhavara km 54.00 to 79.00 in the state of maharashtra
Read moreShort term maintenance to talegaon chakan shikan shikrapur nhavara adhalgaon jamkhed road nh 548d km 95.140 to 95.930 102.110 to 102.950 and 126.400 to 126.500 section nhavara to adhalgaon descope length for year 2324
Short term maintenance to talegaon chakan shikan shikrapur nhavara adhalgaon jamkhed road nh 548d km 95.140 to 95.930 102.110 to 102.950 and 126.400 to 126.500 section nhavara to adhalgaon descope length for year 2324
Read moreDevelopment widening of talegaon chakan shikrapur nhavara section of nh - 548 d from existing chainage km 54.000 to 82.300 and design chainage km 54.000 to 82.120 shikrapur to nhavara section to 2l ps.4l configuration in the state of maharashtra on
Development widening of talegaon chakan shikrapur nhavara section of nh - 548 d from existing chainage km 54.000 to 82.300 and design chainage km 54.000 to 82.120 shikrapur to nhavara section to 2l ps.4l configuration in the state of maharashtra on
Read moreConstruction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.12.700-km.34.000 (section from pune to shirur of nh-753f design length 21.30 km) in the state of maharashtra on bot (toll) mode (package-2) under nh-o
Read moreConstruction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o
Construction of elevated highway corridor (6-lane at-grade and 6-lane elevated highway) from km.34.000-km.59.850 (section from pune to shirur of nh-753f design length 25.850 km) in the state of maharashtra on bot (toll) mode (package-3) under nh-o
Read moreConstruction of elevated highway corridor including provision for metro (at-grade 6-lane elevated highway) from km.(-)2.400-km.12.700 (section from pune to shirur of nh-753f length 15.10 km) in maharashtra on bot (toll) mode (package-1) under nh-o
Construction of elevated highway corridor including provision for metro (at-grade 6-lane elevated highway) from km.(-)2.400-km.12.700 (section from pune to shirur of nh-753f length 15.10 km) in maharashtra on bot (toll) mode (package-1) under nh-o
Read moreUpgradation of existing road to 4/6 lane with 2 lane service road on both sides and cons. of 8 lane elevated flyover at t1 on single pier (section from alandi phata to khed pkg-ii of nh-60 (from km 28.890 to km 42.100) in mh on bot (toll)
Upgradation of existing road to 4/6 lane with 2 lane service road on both sides and cons. of 8 lane elevated flyover at t1 on single pier (section from alandi phata to khed pkg-ii of nh-60 (from km 28.890 to km 42.100) in mh on bot (toll)
Read moreConstruction of six lane elevated corridor from km 508.000 to km 513.150
Construction of six lane elevated corridor from km. 508.000 to km. 513.150 including approaches on nh-66 in the state of goa on epc mode.
Read moreof your Industry type