Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Re Excavation Of Yatra Dighi Water Detention Structure (Wds)
|
| Description |
Re Excavation Of Yatra Dighi Water Detention Structure (Wds) At Mouza Eruar, Jl No 38 Plot No 3582, 9347 Under Eruar Gram Panchyet Within Bhatar Panchyet Samity In The District Of Purba Bardhaman Under Core Sector Programme
|
| Organisation | WATER RESOURCES DEV. DTE. | State Govt. and UT |
| Tender Id | 2025_WRDD_936418_1 |
|
Reference Number |
WRDD/BDNAID/09/2025-26/Gr.F of E.E AI BURDWAN |
| Tender Fee | 0 |
| EMD | 1.5 Lakh |
| Tender Value | - |
| Place | Purba Bardhaman |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2205589 |
| Start Date | November 03, 2025 23:30 |
| End Date |
Expired
21/11/2025
Expired 326 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Re-excavation and development of water detention structure at mouza-jaigir chilakhana, block-tufanganj-i under core-sector programme
Re-excavation and development of water detention structure at mouza-jaigir chilakhana, block-tufanganj-i in the district of coochbehar under coochbehar (ai) division under core-sector programme.
Read moreRcc silt detention structure no 8 nada ii across nala
Rcc silt detention structure no 8 nada ii across nala
Read moreRcc silt detention structure no 7 across main nora nala
Rcc silt detention structure no 7 across main nora nala
Read moreRe-excavation of gouribari pond
Re-excavation of gouribari pond at j.l. no. 36, dag no. 89 at chaitali mouza, bankura district
Read moreRe-excavation of 02 (two) number canals at kalahazra mouza, ramchandrakhali gp under basanti block under core sector program
Re-excavation of canal from house of nayep ali laskar to house of mongal roy, mouza- kalahazra, j.l. no.- 139, plot no.- 463, 641, g.p.- ramchandrakhali, block- basanti, district- south 24 parganas under core sector programme.
Read moreRe-excavation of 02 (two) number canals at kalahazra mouza, ramchandrakhali gp under basanti block under core sector program
Re-excavation of canal from house of essar gharami to house of ayenal molla, mouza- kalahazra, j.l. no.- 139, plot no.- 1496, 1601, g.p.- ramchandrakhali, block- basanti district- south 24 parganas under core sector programme
Read moreRe-excavation of canal from house of sushil shaw to kalahazra kheya ghat, at mouza-manashakhali, block- basanti under core sector programme
Re-re-excavation of canal from house of sushil shaw to kalahazra kheya ghat, at mouza- manashakhali, block- basanti, district- south 24 parganas under kolkata (ai) division under core sector programme.
Read moreLayout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Layout and excavation work,earth filling and hard cementing work,vertical pole support as required for structure,ms trusses support as required for structure,ms purlins or rafters supports as required for structure,wall cladding,tin roofing,doors 7x 3 feet,window 4x4 feet,enamel paint of ms structure,electrical work as required,ceramic tiling work
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.
Read moreRenovation of cd structure at rd.9.914km, jungle clearance and re-sectioning from rd.8.667km to rd.9.800km of jakalgundi distributary.
Renovation of cd structure at rd.9.914km, jungle clearance and re-sectioning from rd.8.667km to rd.9.800km of jakalgundi distributary.
Read moreof your Industry type