Tender Details

Particulars Details
Title
Improvement To The Nallah Bank By Construction Of Protection Wall Near Sy.No . 21/1 Of Village Nanus Ward
Description
Improvement To The Nallah&Amp#X0d Bank By Construction Of&Amp#X0d Protection Wall Near Sy.No.&Amp#X0d 21/1 Of Village Nanus Ward&Amp#X0d No. 5 V.M.C. Valpoi In&Amp#X0d Sattari Taluka.
Organisation WATER RESOURCE DEPARTMENT | State Govt. and UT
Tender Id 2025_WRD_22794_1
Reference
Number
WRD/WDVI/PB/F.30/TN e 10/2025-26/ 130 Line 8 Dated 15/05/2025
Tender Fee 6560
EMD 35596
Tender Value
Place Bicholim
Link https://eprocure.goa.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=23218
Start Date May 19, 2025 20:30
End Date

29/05/2025 ( Expired 33 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Construction of two lane with paved shoulder from design km 0.000 near hiwarkhedi village junction on nh-47 to design km 45.440 near basinda village section of nh-347b of betul-khandwa package 1 in the state of madhya pradesh on ham.

Read more
Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Construction of two lane with paved shoulder from design km 45.325 (ex km 48.870) near basinda village to design km 90.010 (ex km 97.903) near roshni village section of nh-347b of betul-khandwa package-2 in the state of madhya on ham

Read more
Appointment of issuing bank for a letter of credit

Invitation to act as issuing bank for an aggregate/portfolio letter of credit (lc) to cover three sub-projects, such lc backstopped by a guarantee from the international bank for reconstruction and development (ibrd) to support the sngrbp

Read more
Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle.

Construction of r.c.c protection wall to strengthen existing wall on south side of the 220 kv yard and construction of r.r masonry toe wall at south west side of 33 kv yard at 220/33 kv domalapenta ss in nagarkurnool district in mahabubnagar circle

Read more
Construction of nala by laying pipes shantibag colony to pashu hospital village purani chawani zone 23.ward no.64 file no.218/25x3/6.

Construction of nala by laying pipes shantibag colony to pashu hospital village purani chawani zone 23.ward no.64 file no.218/25x3/6.

Read more
Construction of cement concrete road work near h.no.58 (geet mohini gate mandir), k-1,k-2 park k sector ayodhya nagar ward 68 zone 16

Construction of cement concrete road work near h.no.58 (geet mohini gate mandir), k-1,k-2 park k sector ayodhya nagar ward 68 zone 16

Read more
Construction of c.c. road and drain work at sultan sing house to kuar baba mandir tak village nainagir zone 22.ward no.61 file no.91/25x3/6.

Construction of c.c. road and drain work at sultan sing house to kuar baba mandir tak village nainagir zone 22.ward no.61 file no.91/25x3/6.

Read more
Redevelopment of kamathipura cluster lane 1 to 15, kamathipura, mumbai, through a construction- cum development contract by appointment of c and da

Redevelopment of kamathipura cluster lane 1 to 15, kamathipura, mumbai, through a construction- cum development contract by appointment of c and da

Read more
Construction of rcc drain cover and paver block at ward no.42 district sahkari central bank to hariram shah house

Construction of rcc drain cover and paver block at ward no.42 district sahkari central bank to hariram shah house

Read more
Construction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07

Construction of boundary wall around of green belt situated from scheme no. 78 part -2 house no. 136 advance national academy school to hotel 10-11 grand under ward no. 32 zone no.07

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise