Tender Details

Particulars Details
Title
Construction Of Brick And Rubble Masonry Boundary Wall, Heavy Duty Iron Gate Including Compound Earth Filling Around The Allotted Land Of District Judiciary, Near District Agriculture Office, Hatsingimari, South Salmara, Mankachar
Description
Construction Of Brick And Rubble Masonry Boundary Wall, Heavy Duty Iron Gate Including Compound Earth Filling Around The Allotted Land Of District Judiciary, Near District Agriculture Office, Hatsingimari, South Salmara, Mankachar
Organisation Government of Assam
Tender Id 2024_PWBNH_35311_1
Reference
Number
TW-1/SE/GBC/2021-22/482-A, Dt. 04-01-2024
Tender Fee 2200
EMD 2.01 Lakh
Tender Value -
Place O/o the SE PWD Goalpara Building Circle, Goalpara
Link
View Original Tender Notice

https://assamtenders.gov.in

Start Date January 08, 2024 20:30
End Date
Expired 29/01/2024

Expired 989 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed

Read more
Construction of morgue alongwith postmortem room inside the district hospital campus, hatsingimari at south salmara mankachar district.

Construction of morgue alongwith postmortem room inside the district hospital campus, hatsingimari at south salmara mankachar district.

Read more
Repairing and renovation of hatsingimari (phe) sub division office building at hatsingimari under south salmara mankachar (phe) division for the year 2022-23 under sopd-g

Repairing and renovation of hatsingimari (phe) sub division office building at hatsingimari under south salmara mankachar (phe) division for the year 2022-23 under sopd-g

Read more
Re-construction of sht office building (rcc ground floor) at hatsingimari. dist- south salmara, mankachar for the year 2022-23.

Re-construction of sht office building (rcc ground floor) at hatsingimari. dist- south salmara, mankachar for the year 2022-23.

Read more
Re-construction of sht office building (rcc ground floor) at hatsingimari. dist- south salmara, mankachar for the year 2022-23.

Re-construction of sht office building (rcc ground floor) at hatsingimari. dist- south salmara, mankachar for the year 2022-23.

Read more
Construction of brick masonry/concrete boundary wall around the jkspdc complex at tipri thathri

Construction of brick masonry/concrete boundary wall around the jkspdc complex at tipri thathri phase i

Read more
Construction of new boundary wall around proposed solar installation area along with demolition of existing brick masonry shed structure/stone masonry structure/gantry structure and earth filling in water lodged area at kotla.

Construction of new boundary wall around proposed solar installation area along with demolition of existing brick masonry shed structure/stone masonry structure/gantry structure and earth filling in water lodged area at kotla.

Read more
Providing brick masonry boundary wall around railway weighbridge room bachra siding under chp cpp, piparwar area.

Providing brick masonry boundary wall around railway weighbridge room bachra siding under chp cpp, piparwar area.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise