Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of New Boundary Wall Around Proposed Solar Installation Area Along With Demolition Of Existing Brick Masonry Shed Structure/Stone Masonry Structure/Gantry Structure And Earth Filling In Water Lodged Area At Kotla.
|
Description |
Construction Of New Boundary Wall Around Proposed Solar Installation Area Along With Demolition Of Existing Brick Masonry Shed Structure/Stone Masonry Structure/Gantry Structure And Earth Filling In Water Lodged Area At Kotla.
|
Organisation | Bhakra Beas Management Board | Public Sector Undertakings |
Tender Id | 2025_BBMB_232790_1 |
Reference Number |
NIT-919 |
Tender Fee | 2360 |
EMD | 1.93 Lakh |
Tender Value | |
Place | Kotla Power House |
Link | https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=263122 |
Start Date | April 30, 2025 22:30 |
End Date |
21/05/2025 ( Expired 27 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31dat fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Construction of 4-lane vehicular underpass (1x30 mtr x 5.5 mtr) at km 35.344 of nh 31 d at fatapukur along with reinforced earth wall and service road in the ghoshpukur-dhupguri section of nh-31d (new nh-27) in the state of west bengal on epc mode
Read moreConstruction of brick masonry boundary wall with iron grills and other allied works around the newly constructed international family hostel at chatha campus, skuast-jammu
Construction of brick masonry boundary wall with iron grills and other allied works around the newly constructed international family hostel at chatha campus, skuast-jammu
Read moreConstruction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement
Construction of 1400 m long approx. new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling existing old boundary wall with installing of 2 nos gate near kali bari from hukuta chariali to sbi colony at duliajan, including supply of all materials except cement
Read moreConstruction of new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling of old wall from dz 16 to e 92, duliajan including supply of all materials except cement
Construction of new rcc framed brick boundary wall of 230mm thick, 3.05m height and 600mm y overhang with concertina coil by dismantling of old wall from dz 16 to e 92, duliajan including supply of all materials except cement
Read moreConstruction of 2 nos rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0 phase-iii within amc
Construction of 2 nos rcc ohr along with land development approach road guard room and boundary&#x0d wall ....... in all respect of proposed water supply scheme at rail par zone-36 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of rcc ohr along with land development approach road guard room and boundary wall ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0 phase-iii within amc
Construction of rcc ohr along with land development approach road guard room and boundary wall&#x0d ....... in all respect of proposed water supply scheme at kalajharia zone-32 asansol under amrut 2.0&#x0d phase-iii within amc
Read moreConstruction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Construction of stone masonry wall along the existing footpath from forebay to sidrapong power house, repairing of the footpath and cross drain along with other necessary rectification works at sidrapong hydro electric project
Read moreSupply, installation, erection, commissioning and synchronization of minimum 1mw capacity solar power plant including dpr preparation and construction of new structure/strengthening of existing structure at mcl, walayar plant on boot basis
Supply, installation, erection, commissioning and synchronization of minimum 1mw capacity solar power plant including dpr preparation and construction of new structure/strengthening of existing structure at mcl, walayar plant on boot basis
Read moreConnection of 3 nos. new o.h. tank with existing water supply system and repair of compound wall, damaged drain and misc. works near 2 nos. o.h.t. at urja nagar and 1 nos. o.h.t. at sn colony of gevra area
Connection of 3 nos. new o.h. tank with existing water supply system and repair of compound wall, damaged drain and misc. works near 2 nos. o.h.t. at urja nagar and 1 nos. o.h.t. at sn colony of gevra area
Read moreof your Industry type