Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair To Stone/Brick Masonry Toe Wall Dwarf Wall Nat/Vift And Traverses Stone Pitching And Earth Filling At Afs Amla
|
| Description |
Repair To Stone/Brick Masonry Toe Wall Dwarf Wall Nat/Vift And Traverses Stone Pitching And Earth Filling At Afs Amla
|
| Organisation | Defence eProcurement Portal |
| Tender Id | 2023_MES_607375_1 |
|
Reference Number |
8547/E8 of 2023-24 |
| Tender Fee | 500 |
| EMD | 40000 |
| Tender Value | - |
| Place | GE (AF) Ama |
| Link |
View Original Tender Notice
https://defproc.gov.in |
| Start Date | July 10, 2023 21:30 |
| End Date |
Expired
22/07/2023
Expired 1182 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Construction of cc road for diversion of khaperkheda to parseoni sh no. 346 (ch. 9/560 to ch. 11/100) and stone pitching on embankment along with toe wall at singhori deep ocm under bssa(incl. maintenance of 05 years without any cost implications)
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreRepairs to plastering, flooring stone/ brick masonry/toe wall, dwarf wall, nat/ vift and traverses and certain b/r works in x area at afs amla
Repairs to plastering, flooring stone/ brick masonry/toe wall, dwarf wall, nat/ vift and traverses and certain b/r works in x area at afs amla
Read moreRepair to plastering, flooring, stone brick masonary/toe wall, dwarf wall nat/ vift and traverses and certain b/r works at afs amla
Repair to plastering, flooring, stone brick masonary/toe wall, dwarf wall nat/ vift and traverses and certain b/r works at afs amla
Read moreRepair to stone pitching, pointing walling, pcc coping, toe wall, vift wall and retaining wall at technical area at ins kalinga, visakhapatnam
Repair to stone pitching, pointing walling, pcc coping, toe wall, vift wall and retaining wall at technical area at ins kalinga, visakhapatnam
Read moreRepairing of toe wall with stone masonry and stone pitching of embankment at kumharpatti near katri river ramkanali under katras area
Repairing of toe wall with stone masonry and stone pitching of embankment at kumharpatti near katri river ramkanali under katras area
Read moreRepair to stone pitching, pointing walling, pcc coping, toe wall, vift wall and retaining wall at non-technical area at ins kalinga, visakhapatnam
Repair to stone pitching, pointing walling, pcc coping, toe wall, vift wall and retaining wall at non-technical area at ins kalinga, visakhapatnam
Read moreConstruction of stone masonry toe wall , stone pitching work and providing , laying and fixing of precast rcc box culvert at industrial area umaria , tehsil dug , jhalawar
Construction of stone masonry toe wall , stone pitching work and providing , laying and fixing of precast rcc box culvert at industrial area umaria , tehsil dug , jhalawar
Read moreRepair to culverts, stone pitching to channel of nallah, gratings and concrete works at down stream and upstream of culvert at afs amla
Repair to culverts, stone pitching to channel of nallah, gratings and concrete works at down stream and upstream of culvert at afs amla
Read moreof your Industry type