Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
1. Signalling Arrangement In Connection With Proposed Construction Of Road Under Bridge (Rub) In Lieu Of Lc No. 135 (M) Up, Dn &Amp Third Line Portion At Km 554/2 4 As Precast Rcc Box Of Size 1x5.50x5.00m At Gnn Yard, By Air Pushing Method.
2. Signalling Arrangement In Connection With Proposed Construction Of Road Under Bridge (Rub) In Lieu Of Lc No. 75 (M) Up, Dn &Amp Third Line Portion At Km 417/3 5 As Precast Rcc Box Of Size 1x5.50x5.00m Between Ink Kdm Stations By Air Pushing Method.
3.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 73973124 |
|
Reference Number |
C_SG_36_492 |
| Tender Fee | 0 |
| EMD | 2.53 Lakh |
| Tender Value | |
| Place | Secunderabad |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/73973124/viewNitPdf_4501098.pdf |
| Start Date | March 12, 2024 18:49 |
| End Date |
Expired
02/04/2024
Expired 824 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Kzj-bza section - proposed construction of road under bridge (rub) in lieu of lc no. 63a (m) up, dn & third line portion at km 379/22-24 as precast rcc box of size 2x5.50x5.50m along with limited height subway (lhs) at lc location as precast rcc box of size 1x3.00x3.00m between wl-cle stations by air pushing method
For complete deion and other details, please refer to tender
Read moreKzj-bza section - proposed construction of road under bridge (rub) in lieu of lc no. 63a (m) up, dn & third line portion at km 379/26-28 as precast rcc box of size 2 x 5.50 x 5.00 m along with limited height subway (lhs) at lc location km 379/22-24 as precast rcc box of size 1x3.00x3.00 m between wl - cle stations by air pushing method.
For complete deion and other details, please refer to tender
Read moreConstruction of a new rub (rail under bridge) by box pushing technique in connection with construction of independent up line for movement of trains to mechanical handling plants of ppa
Construction of a new rub (rail under bridge) by box pushing technique in connection with construction of independent up line for movement of trains to mechanical handling plants of ppa
Read more1). signalling arrangement in connection with proposed replacement of lc with rcc box (rub) at lc no. 09 (vkb-prli section) at km no. 15/7-8 2). signalling arrangement in connection with proposed replacement of lc with rcc box (rub) at lc no. 71 (vkb-prli section) at km no. 137/3-4 3). sc - kzj section: signalling arrangement in connection with proposed construction of road under bridge (rub) at lc no. 46 at km no. 295/20-22 between rgp-ipg section 4). signalling arrangements for proposed up-g
For complete deion and other details, please refer to tender
Read moreGuntakal division - ohe modifications in connection with proposed construction of rub no.512-a of size 2x5.0x4.5m(twin box) rcc box in lieu of lc no.120 at km 260/11-13 between krishnapuram and kadapa stations by box pushing method
For complete deion and other details, please refer to tender
Read moreSw-i: proposed construction of rub no.164-a of size 2x6.0x5.0m(twin box) rcc box in lieu of lc no.107 at km 90/23-25 between renigunta and tirupati stations by box pushing method sw-ii : proposed construction of rub no.168-a of size 2x5.0x3.60m(twin box)rcc box in lieu of lc no.109 at km 87/11-13 between tiruchanur andtirupati stations by box pushing method sw-iii: proposed construction of road under bridge in lieu of lc no 117 at km 235/2-3 between vp-bnl stations as 1x6.00x5.00m rcc box by
For complete deion and other details, please refer to tender
Read moreConstruction of road over bridge (rob) in lieu of level crossing no. 105 near bargwan yard
Construction of road over bridge (rob) in lieu of level crossing no. 105 near bargwan yard for railway portion and proposed new lhs no. 1318/1a by box pushing method for both existing up and dn line in connection with katni- singrauli rail doubling
Read moreConstruction of precast triple cell box culvert in lieu of existing pipe culvert across dr.d.g.s dinakaran salai in div171, zonexiii by epc method
Construction of precast triple cell box culvert in lieu of existing pipe&#x0d culvert across dr.d.g.s dinakaran salai in div171, zonexiii&#x0d by epc method
Read moreGuntakal division: sw-i: klu-gtl section: proposed construction of road under bridge (subway) in lieu of lc no 157 at km 278/5-6 between gpu-gtl stations as 2x5.0x3.60m rcc box by box pushing method. sw-ii: ru-gy scetion: proposed construction of rub no.512-a of size 2x5.0x4.5m(twin box) rcc box in lieu of lc no.120 at km 260/11-13 between krishnapuram and kadapa stations by box pushing method.
For complete deion and other details, please refer to tender
Read moreRajkot division - s&t work in connection with (i)providing rub of box 4x2.5 size by pushing method km.674.05 near closed lc-72 between than-lmc on sunr-wkr section (ii)providing rob in lieu of lc no.233 at km 880/7-8 between mdpr-kmbl section.
For complete deion and other details, please refer to tender
Read moreof your Industry type