Tender Details
Particulars | Details |
---|---|
Title |
Balance Work Of Construction Of Roads And Drains In Dheewar Panchayat, At Ntpc Barh At The Risk And Cost Of Po 4600070668
|
Description |
Balance Work Of Construction Of Roads And Drains In Dheewar Panchayat, At Ntpc Barh At The Risk And Cost Of Po 4600070668
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | Barh Super Thermal Power Plant , P.O. BARH , 803213 , BARH , Bihar |
Link |
AAAAAAAAAA Login to view |
Start Date | April 26, 2025 14:30 |
End Date |
10/05/2025 ( 11 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Procurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda
Procurement of consumables for agilent make dga and atomic absorption spectrophotometer at ntpc mouda
Read moreIe services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)
Read moreEngineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)
Read moreUpgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o
Read moreConstruction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Construction of 6 lane vup at km. 264.237 along with service road in village kherika on hisar - dabwali section of nh-09 in the state of haryana on epc mode
Read moreConsultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Consultancy services for preparation of detailed project report and feasibility study for construction of 4 lane in section kohmara to ghoti km 0.000 to km 28.00 forest section in kohmara- goregaon- gondia- tirora- masnar road nh 753 length 28.00 km
Read moreRectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Rectification work of cement concrete pavement of deoli kota section of in the state of rajasthan package-2 on risk and cost of contractor
Read moreShort term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Short term improvement and routine maintenance work of tolling reach of mundiyar fp frm km 1184.322 to 1251.814 length 67.492 km on baran shivpuri sec of new nh 27 in rajasthan on pbmc mode
Read moreShort term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Short term improvement and routine maintenance work of tolling reach of ramnagar fp from km 1251.814 to 1305.087 l53.273 km on baran shivpuri sec of new nh27 in madhya pradesh on pbmc mode.
Read moreof your Industry type