Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Design, Fabrication, Supply And Installation Of Signage And Graphics For Twelve (12) Underground Metro Stations Of Reach 6 Under Phase Ii.
|
| Description |
Design, Fabrication, Supply And Installation Of Signage And Graphics For Twelve (12) Underground Metro Stations Of Reach 6 Under Phase Ii.
|
| Organisation | Bangalore Metro Rail Corporation Limited | Public Sector Undertakings |
| Tender Id | 2025_BMRCL_240496_1 |
|
Reference Number |
SandG-R-6-UG |
| Tender Fee | 11800 |
| EMD | 11.53 Lakh |
| Tender Value | - |
| Place | Bangalore |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=273945 |
| Start Date | August 01, 2025 16:30 |
| End Date |
Expired
06/08/2025
Expired 433 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, manufacture, supply, installation, testing and commissioning of telecommunication system for 3 stations of jmrts phase-1c and 1d project.
Design, manufacture, supply, installation, testing and commissioning of telecommunication system for 3 stations of jmrts phase-1c and 1d project.
Read moreE-tender for selection of licensee for operating parking lots at reach 2& 3 metro stations parking tender 58
E-tender for selection of licensee for operating parking lots at reach 2& 3 metro stations parking tender 58
Read moreDesign verification, detail engineering, supply, installation, testing, commissioning of electrical and mechanical system, dg set, environment control system, tunnel ventilation system and building management system for 07 underground metro stations
Design verification, detail engineering, supply, installation, testing, commissioning of electrical and mechanical system, dg set, environment control system, tunnel ventilation system and building management system for 07 underground metro stations
Read moreDesign and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Design and construction of elevated viaduct twin tunnel by shield tbm cut and cover tunnel mid ventilation cum emergency egress shaft crosspassages ramps two underground stations bengali chauraha and palasia chauraha including architectural finishing
Read moreDdc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Ddc for design of 25 kv overhead equipment (ohe) system for the elevated line, power supply and scada for both underground and elevated lines including checking of design of receiving substations and design validation of jaipur metro phase-2 project.
Read moreAnnual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Annual rolling shutter maintenance of 30 nos of elevated and underground stations and 2 depots of pune metro project for a period of one year.
Read moreAnnual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Annual civil maintenance of 28 nos of elevated and underground stations, 12.15 kms of tunnel and 2 depots of pune metro project for a period of one year.
Read morePart design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Part design and construction of elevated viaduct, integrated dds (including ramp) and ten elevated stations from chainage- 0m to 11299.093m of rithala-kundli corridor of phase- iv of delhi mrts.
Read moreDc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.
Dc of twin tunnel (up and down lines) by shield tbm along with four underground stations including their connecting subways, associated entry/exits, etc., for the central vista corridor under phase-v(a) project of delhi mrts.
Read moreDesign, manufacture, supply, installation, testing and commissioning of automatic fare collection system including central computer and back-office for 24 stations of corridor-1 and 2 of phase-1 of patna mrts with fi/acquirer bank.
Design, manufacture, supply, installation, testing and commissioning of automatic fare collection system including central computer and back-office for 24 stations of corridor-1 and 2 of phase-1 of patna mrts with fi/acquirer bank.
Read moreof your Industry type