Tender Details

Particulars Details
Title
Selection Of Contractor For Integrated Infrastructure Development Works, In Atal Puram Township At Gwalior Road Agra In The State Of Uttar Pradesh On Epc Basis
Description
Selection Of Contractor For Integrated Infrastructure Development Works, In Atal Puram Township At&Amp#X0d Gwalior Road Agra In The State Of Uttar Pradesh On Epc Basis
Organisation Agra Development Authority | State Govt. and UT
Tender Id

AAAAAAAAAA

Login to view
Reference
Number

AAAAAAAAAA

Login to view
Tender Fee 6.35 Lakh
EMD 4.13 Crore
Tender Value
Place Agra Development Authority
Link

AAAAAAAAAA

Login to view
Start Date June 03, 2025 22:05
End Date

17/06/2025 ( 12 days left )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Cs for ae for supervision of construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in mp on epc mode.

Read more
Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh

Consultancy services for preparation of detailed project report for development of 4lane national highway 128b from ballia (junction on nh31 near teekha) to mau (length 56km) section in uttar pradesh

Read more
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278

Read more
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh

Construction of underpasses at 5 blackspot locations in the project highway at specified locations from ch. 23.600 to ch. 149.900 of nh34 (old nh91) from ghaziabad to aligarh on epc mode in the state of uttar pradesh

Read more
Selection of epc contractor for chitrakoot link expressway

Development of access controlled greenfield 4 lane (expandable to 6 lane) chitrakoot link expressway in the state of uttar pradesh on engineering, procurement and construction (epc) mode

Read more
Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Construction of (i) entry ramp on lhs exit ramp on rhs near pedakakani at km.412.300 and (ii) service road opposite kaza village from km.421.330 to km.421.570 on rhs on chilakaluripeta vijayawada section of nh 16 in the state of ap on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise