Tender Details

Particulars Details
Title
Work Of Construction Of Electric Line For Connection Of Having Load 13 Kw, 29 Kva And 40 Kva For Street Lights At Different Places For M/S O.S.E.Etawah Chakeri Kanpur Highway Pvt. Ltd At Harrisganj Division Under The Area Of E.U.D.C. Iii Kes Co. Kanpu
Description
Work Of Construction Of Electric Line For Connection Of Having Load 13 Kw, 29 Kva And 40 Kva For Street Lights At Different Places For M/S O.S.E.Etawah Chakeri Kanpur Highway Pvt. Ltd At Harrisganj Division Under The Area Of E.U.D.C. Iii Kes Co. Kanpu
Organisation Government of Uttar Pradesh
Tender Id 2023_KESCO_803940_2
Reference
Number
17/EUDC-III/2023-24
Tender Fee 3540
EMD 12000
Tender Value -
Place Office of SE, EUDC-III KESCo Kanpur
Link
View Original Tender Notice

https://etender.up.nic.in

Start Date June 26, 2023 19:30
End Date
Expired 05/07/2023

Expired 1198 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Radiator blower motor with impeller and impeller fittings of powder drivers for 1300 kva emu transformer fitted in medha rake as per high volt electricals pvt. ltd. part no. e130050020, spec. kw -0.37/0.55, volt - 415 +/- 10 percent , effic. percent 73/80, hp - 0.5/0.75, hz-50 +/-5 percent , cos 0.56/0.87, rpm-1450/2850, amp-1.3/1.1, conn-star/delta, amb-40 degree c, wt-13kg, max alt 1000 mtr. make - mototek or similar, model - m3054/2hxp7181451/both.

Radiator blower motor with impeller and impeller fittings of powder drivers for 1300 kva emu transformer fitted in medha rake as per high volt electricals pvt. ltd. part no. e130050020, spec. kw -0.37/0.55, volt - 415 +/- 10 percent , effic. percent 73/80, hp - 0.5/0.75, hz-50 +/-5 percent , cos 0.56/0.87, rpm-1450/2850, amp-1.3/1.1, conn-star/delta, amb-40 degree c, wt-13kg, max alt 1000 mtr. make - mototek or similar, model - m3054/2hxp7181451/both.

Read more
Work of installation of 250 kva distribution transformer at different places in harrisganj division under the area of e.u.d.c.-iii kesco. kanpur

Work of installation of 250 kva distribution transformer at different places in harrisganj division under the area of e.u.d.c.-iii kesco. kanpur

Read more
Electrification work through pcc pole by replacing of bans balli at harrisganj distribution division under the area of e.u.d.c.-iii, kidwai nagar, kesco. kanpur

Electrification work through pcc pole by replacing of bans balli at harrisganj distribution division under the area of e.u.d.c.-iii, kidwai nagar, kesco. kanpur

Read more
Trimming of tree branches by tree cutting machine at eudd-jajmau, harrisganj, naubasta, daheli sujanpur and hanspuram under the area of e.u.d.c.-iii, kesco, kanpur

Trimming of tree branches by tree cutting machine which are touching the h.t. and l.t. electric lines due to which electrical accident may occur and removing of trimming scraps at eudd-jajmau, harrisganj, naubasta, daheli sujanpur and hanspuram

Read more
Work of installation of pole meters outside the 369 consumers premises having load 50 kw and above in the area of eutd- iii, under e.u.d.c.-iii, kesco kanpur

Work of installation of pole meters outside the 369 consumers premises having load 50 kw and above in the area of eutd- iii, under e.u.d.c.- iii, kesco kanpur

Read more
Mounting of double metering of the consumer having load from 10 kw to 24 kw under eudc-iv, kesco.

Mounting of double metering of the consumer having load from 10 kw to 24 kw under eudc-iv, kesco.

Read more
Work of new pipe type earthing to the old/damaged neutral and earthing of 55 distribution transformers already installed at various places at harrisganj division under the area of e.u.d.c.- iii, kesco kanpur

Work of new pipe type earthing to the old/damaged neutral and earthing of 55 distribution transformers already installed at various places at harrisganj division under the area of e.u.d.c.- iii, kesco kanpur

Read more
Work for erection of double pole metering of consumer having load of 10 kw to 24 kw under eudc ii kesco kanpur

Work for erection of double pole metering of consumer having load of 10 kw to 24 kw under eudc ii kesco kanpur

Read more
Work for erection of double pole metering of the consumers having load 10 kw to 24 kw under eudc-ii kesco kanpur

Work for erection of double pole metering of the consumers having load 10 kw to 24 kw under eudc-ii kesco kanpur

Read more
Work for providing double metering of the consumer having load above 25 kw under eudc-i, kesco.

Work for providing double metering of the consumer having load above 25 kw under eudc-i, kesco.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise