Tender Details
Particulars | Details |
---|---|
Title |
Design, Construction, Manufacturing, Supply, Installation, Commissioning Of Multi Color Programable Waterfall Fountain Having Length Of 120 Mts Over Tawi River On Epc Mode With Five Years Of O And M (Phase Ii) (Under Ncap)
|
Description |
Design, Construction, Manufacturing, Supply, Installation, Commissioning Of Multi Color Programable Waterfall Fountain Having Length Of 120 Mts Over Tawi River On Epc Mode With Five Years Of O And M (Phase Ii) (Under Ncap)
|
Organisation | HAUDD | State Govt. and UT |
Tender Id | 2024_HAUDD_259605_1 |
Reference Number |
Fresh RFP No 21(P) of 2024-25 (2nd Call) |
Tender Fee | 5000 |
EMD | 5.38 Lakh |
Tender Value | |
Place | Jammu |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=768517 |
Start Date | October 12, 2024 15:30 |
End Date |
25/10/2024 ( Expired 193 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Consultancy services for ae for construction of new 6-lane access control prayagraj southern gf bypass from design km 34.400 (near dandupur) to design km. 43.200 (near mahuwari) total length 8.800 km pkg-1 under phase-i in up under nh(o) on epc mode
Read moreDevelopment of leisure valley phase-ii, commercial cum shopping complex package-iii at plot no. gh 02 sector-tech zone-iv, greater noida (up) on design, engineering, procurement and construction (epc) basis with comprehensive oand m of 2 years
Development of leisure valley phase-ii, commercial cum shopping complex package-iii at 
 plot no. gh 02 sector-tech zone-iv, greater 
 noida (up) on design, engineering, procurement 
 and construction (epc) basis with comprehensive 
 o and m of 2 ye
Read moreDevelopment of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Development of 4 lane ac greenfield regional expressway on northern side of hyderabad from reddipalle vill (dc. 33.000) to islampur vill (dc. 59.000) for a design length of 26.000 km in telangana under nh(o) on epc mode (package ii)
Read moreSurvey design and execution of sewerage scheme samba town under pollution abatement of river basanter at samba jkunder nrcp on epc fixed cost basis incl o and m for 5 years after successful completion of free trial of 6 mths. cno sdj/w/76/24-25
Survey design and execution of sewerage scheme samba town under pollution abatement of river basanter at samba jkunder nrcp on epc fixed cost basis incl o and m for 5 years after successful completion of free trial of 6 mths. cno sdj/w/76/24-25
Read moreSupply, installation, testing and commissioning of 3 nos. of 120 mt automated weighbridge systems with 6 years o and m including 2 years guarantee period on epc mode at voc port authority
Supply, installation, testing and commissioning of 3 nos. of 120 mt automated weighbridge systems with 6 years o and m including 2 years guarantee period on epc mode at voc port authority
Read moreSupply, installation, testing and commissioning of outdoor cctv surveillance system at mbb college lake with integration to existing iccc in epc mode and post completion o and m for five years including dlp of one year
Supply, installation, testing and commissioning of outdoor cctv surveillance system at mbb college lake with integration to existing iccc in epc mode and post completion o and m for five years including dlp of one year
Read moreDesign engineering manufacture procurement supply installationtesting commissioning including warrantee obligation with 05 years comprehensive o and m 10 mw ac capacity of ground mounted solar pv plant at gangapur ii rajnagar birbhum wb
Design engineering manufacture procurement supply installationtesting commissioning including warrantee obligation with 05 years comprehensive o and m 10 mw ac capacity of ground mounted solar pv plant at gangapur ii rajnagar birbhum wb
Read moreDesign, construction, manufacturing, supply, installation, commissioning of multi-color programable waterfall fountain having length of 120 mts over tawi river on epc mode with five years of o and m (phase-ii) (under ncap)
Design, construction, manufacturing, supply, installation, commissioning of multi-color programable waterfall fountain having length of 120 mts over tawi river on epc mode with five years of o and m (phase-ii) (under ncap)
Read moreSupply, installation, testing and commissioning of surveillance system at identified locations around water bos of lcma -phase-ii along with o and m of three years for phase-i and phase-ii works
Supply, installation, testing and commissioning of surveillance system at identified locations around water bos of lcma -phase-ii along with o and m of three years for phase-i and phase-ii works
Read moreDesign, construction, manufacturing, supply, installation, commissioning of multi-color programable waterfall fountain having length of 120 mts over tawi river on epc mode with five years of o and m (phase-ii) (under ncap)
Design, construction, manufacturing, supply, installation, commissioning of multi-color programable waterfall fountain having length of 120 mts over tawi river on epc mode with five years of o and m (phase-ii) (under ncap)
Read moreof your Industry type