Tender Details

About Tender

🛣️ E Tender Invitation For User Fee Agency Services 🛣️ The National Highways Authority Of India (Nhai) Is Seeking Proposals For The Engagement Of A User Fee Agency (Ufa) For The Danamaiahgaari Palle Fp On Nh 42, Specifically For The Palamaneru To Krishnagiri Section From Design Km 58.600 To Km 140.040. 🚦 📅 Proposal Submission Deadline: July 11, 2024, 11:00 Am This Engagement Is For The Use Of The Two Lane Road With Paved Shoulders On National Highway 42 In Andhra Pradesh. Interested Parties Are Invited To Submit Their Proposals Through The E Tender Process. 📋 Keywords: Nhai, User Fee Agency, E Tender, Nh 42, Andhra Pradesh, Road Infrastructure, Public Sector Undertaking, Government Tender
Particulars Details
Title
Engagement Of User Fee Agency Through E Tender At Danamaiahgaari Palle Fp At Km 88.810 For The Use Of Two Lane With Paved Shoulders Of Palamaneru To Krishnagiri Section From Design Km58.600 To Km140.040 Of Nh 42in Andhra Pradesh
Description
Engagement Of User Fee Agency Through E Tender At Danamaiahgaari Palle Fp At Km 88.810 For The Use Of Two Lane With Paved Shoulders Of Palamaneru To Krishnagiri Section From Design Km58.600 To Km140.040 Of Nh 42in Andhra Pradesh
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_199639_1
Reference
Number
NHAI/13013/547/CO/24-25/ CB/Danamaiahgaari FP
Tender Fee 0
EMD 0
Tender Value
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=218541
Start Date June 27, 2024 22:30
End Date

11/07/2024 ( Expired 284 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders

Rehabilitaion and up gradation of existing km. 98.750 design ch 121.500 to existing km 83.690 design ch 136.500 and from existing km 78.050 design ch 161.281 to pimpalgaon baswant existing km 59.100 design ch. 161.281 to two lane with paved shoulders

Read more
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan

Read more
Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Consultancy services of independent engineer for upgradation to two lane with paved shoulder configuration from km. 0/000 to 62/822 (limbdi-dhrangadhra section) of nh-51 in the state of gujarat (total length- 62.822km) on ham mode

Read more
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Widening/re-construction to two lane with paved shoulder of nh-143ag from km 37.400 (design chainage) to km 85.560 (design chainage) bero-khunti section in the state of jharkhand on epc mode for the fy 2023-24

Read more
Design, supply and installation of highway lighting at 17 locations on krishnagiri to walajahpet section of nh-48 (old nh-46) in the state of tamil nadu on an item rate (percentage) basis

Design, supply and installation of highway lighting at 17 locations on krishnagiri to walajahpet section of nh-48 (old nh-46) in the state of tamil nadu on an item rate (percentage) basis

Read more
Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.

Providing short term road safety measures at morth identified blackspots locations based on accident data of 2019-21 of hyderabad-vijayawada section of nh-65 (old nh-9) from km.40.000 to 221.500 in the states of telangana and andhra pradesh.

Read more
Construction of drain at rob near iti in raebareli

Construction of drain at rob near iti in raebareli form ch 146 500 ato km 147 500 on tanda rabareli section of nh 232 of 2 lane with paved shoulders in the state of uttar pradesh

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise