Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Part No 57402 G2849, Boom Pressurization Fittings,Part No 57402 G2839, Kit Pressurization
|
| Description |
|
| Organisation | COAL INDIA LIMITED | Ministry of Coal |
| Tender Id | GEM/2024/B/5487860 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | October 23, 2024 21:07 |
| End Date |
Expired
13/11/2024
Expired 697 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Procurement of 30w street light led fittings at stpp, jaipur, mancherial, telangana
Procurement of 30w street light led fittings at stpp, jaipur, mancherial, telangana
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreAnnual procurement of pvc, cpvc, hdpe pipes and electrofusion fittings for water supply works
Annual procurement of pvc, cpvc, hdpe pipes and electrofusion fittings for water supply works
Read moreProcurement of 30w and 100w led light fittings for use at area workshop bellampalli area.
Procurement of 30w and 100w led light fittings for use at area workshop bellampalli area.
Read moreProcurement of 20w 110v 2 feet led tube light fittings for use at vkp mine, rg2
Procurement of 20w 110v 2 feet led tube light fittings for use at vkp mine, rg2
Read moreProcurement of led light fittings and led screw type bulbs for use at vkp mine, rg2.
Procurement of led light fittings and led screw type bulbs for use at vkp mine, rg2.
Read moreConstruction of brick wall, plastering, painting, electrical fittings and sanitary fittings in community hall at maisamma bayi, hyderguda, attapur division, ward 61, rjnr circle-11, ghmc. (a s date 01-12-2025, budget year 2025-26) (rs.11.00 lakhs) (re call)
Construction of brick wall, plastering, painting, electrical fittings and sanitary fittings in community hall at maisamma bayi, hyderguda, attapur division, ward 61, rjnr circle-11, ghmc. (a s date 01-12-2025, budget year 2025-26) (rs.11.00 lakhs) (re call)
Read moreRepairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Repairing of walkways and platform of boom pulley assy. of 7820 dragline and fabrication and fitment of side collars of drag and hoist rope drum of 7820 dragline.
Read moreEstimate for arrenging of exesting mast on ms tubular poles with new led fittings at patancheru police station near bus stop in patancheru circle-46, serilingampally zone, cmc. (2026-27)(rs.2,32,300/-)
Estimate for arrenging of exesting mast on ms tubular poles with new led fittings at patancheru police station near bus stop in patancheru circle-46, serilingampally zone, cmc. (2026-27)(rs.2,32,300/-)
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreof your Industry type