Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services 200140789 Job Contract For Conducting Water Balance Study/Audit At Ntpc V
|
| Description |
|
| Organisation | NA | Ministry of Power |
| Tender Id | GEM/2025/B/6327504 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | June 10, 2025 22:34 |
| End Date |
Expired
23/06/2025
Expired 475 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Conducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Conducting external safety audit (esa) for entire ktps-v and vi stages plant premises for the year 2026-27
Read moreProviding balance drinking water facility to double bed room houses at srirampur (v) of srirampur(m)
Providing balance drinking water facility to double bed room houses at srirampur (v) of srirampur(m)
Read moreC/o balance work (walls, flooring to zphs tandur of tandur (v) at nagireddypet (m) in yellareddy assembly constituency in kamareddy district est cost of rs 20.00 lakhs
C/o balance work (walls, flooring to zphs tandur of tandur (v) at nagireddypet (m) in yellareddy assembly constituency in kamareddy district est cost of rs 20.00 lakhs
Read moreEstimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Estimate for conducting geotechnical investigation including boreholes drilling, collection of soil and rock sample, field and laboratory testing for assessment of stability and seepage characteristics of earthen dam of sri komuram bheem project near ada (v), asifabad (m), komuram bheem asifabad (dist).
Read moreAnnual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreConducting of feasibility study by m/s bhel
Conducting of feasibility study by m/s bhelin stage#1 for replacement of soot blower piping hose with fixed pipe
Read moreConducting hazard identification and risk analysis hira study as per
Conducting hazard identification and risk analysis hira study as perguidelines of is 15656 2006
Read moreJob of conducting manpower study at wadilube installation
Job of conducting manpower study at wadilube installation
Read moreof your Industry type