Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Construction Of 3 Nos Security Kiosk At Raiganj Gmch (Site 2) Uttar Dinajpur In The Year 2025
|
Description |
&Amp#X0d
Construction Of 3 Nos Security Kiosk At Raiganj Gmch (Site 2) Uttar Dinajpur In The Year 2025&Amp#X0d
|
Organisation | WEST BENGAL MEDICAL SERVICES CORPORATION LIMITED | State Govt. and UT |
Tender Id | 2025_WBMSC_864371_1 |
Reference Number |
WBMSCL/ NIT-488/2025, Date- 11.06.2025 |
Tender Fee | 0 |
EMD | 13475 |
Tender Value | |
Place | Raiganj GMCH site 2 |
Link | https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1941649 |
Start Date | June 16, 2025 16:30 |
End Date |
24/06/2025 ( Expired 15 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Design and construction of 2 nos type-v married accommodation including surveys / soil investigation, internal/ external services at hq ce (p) chetak
Design and construction of 2 nos type-v married accommodation including surveys / soil investigation, internal/ external services at hq ce (p) chetak
Read moreConstruction of 03 nos. of foot over bridge at km 141.150 sengodagoundenpudur, km 142.800 mudilipalayam pirivu and km.143.950 neelambur in the project stretch of chengapalli walayar section of nh-544 in the state of tamil nadu on epc mode
Construction of 03 nos. of foot over bridge at km 141.150 sengodagoundenpudur, km 142.800 mudilipalayam pirivu and km.143.950 neelambur in the project stretch of chengapalli walayar section of nh-544 in the state of tamil nadu on epc mode
Read moreDevelopment of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Development of multi modal logistics park (mmlp) at varanasi in the state of uttar pradesh on engineering, procurement and construction mode
Read moreOperation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Operation and maintenance of stp plants at chtp, sltp, gtni, ajg, hcc metro station and sultanpur depot and etp plant at sultanpur depot and wtp at sultanpur depot and gurugram staff quarter in line-2 south(for 3 years).
Read moreConstruction of cc road at ward 3 vallabh nagar gali no. 3 in sachin yadav house to jyoti gangle house.
Construction of cc road at ward 3 vallabh nagar gali no. 3 in sachin yadav house to jyoti gangle house.
Read moreConstruction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.
Construction of residential building phase 1 at midc on cts nos 42 pt of village kondivate, k east ward of metro line 3 at midc metro station, andheri east.
Read moreAncillary work in connection with construction of 50 bedded critical care block g plus 3 at malda medical college and hospital under malda division, pwd in the district of malda.
Ancillary work in connection with construction of 50 bedded critical care block g plus3 at malda medical college and hospital under malda division, pwd in the district of malda.
Read moreJjm scheme in amarpur rd block under gomati district during the year 2024-25/sh- drilling and development of 3 (three) nos. small bore deep tube well (sbdtw) by manual means in/c. installation of pump set, electrical panel board to be install in m.s
Jjm scheme in amarpur rd block under gomati district during the year 2024-25/sh- drilling and development of 3 (three) nos. small bore deep tube well (sbdtw) by manual means in/c. installation of pump set, electrical panel board to be install in m.s
Read moreCs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Cs for preparation of dpr for (i) cons. of 6 lane prayagraj southern bypass phase2 (l 34.4 km) section from km 0.000 to 34.400 in uttar pradesh (ii) construction of new bridge at yamuna river parallel to naini cable stayed bridge in uttarpradesh
Read moreRoutine repair and maintenance in connection with plumbing and water supply at hall area zone-2 for the financial year 2025-26.
Routine repair and maintenance in connection with plumbing and water supply at hall area zone-2 for the financial year 2025-26.
Read moreof your Industry type