Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of R 404 A Refrigerant Gas Along With New Cylinders Used In Mellcon Air Dryers For Bop I/Stage I/Ytps.
|
| Description |
Supply Of R 404 A Refrigerant Gas Along With New Cylinders Used In Mellcon Air Dryers For Bop I/Stage I/Ytps.
|
| Organisation | TELANGANA POWER GENERATION CORPORATION LIMITED-Chief Engineer Civil Construction YTPS |
| Tender Id | Login to view |
|
Reference Number |
Login to view |
| Tender Fee | - |
| EMD | - |
| Tender Value | 0 |
| Place | Telangana |
| Link | Login to view |
| Start Date | October 16, 2026 23:30 |
| End Date |
Open
26/10/2026
8 days left |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of nitrogen gas with new cylinders used in mellcon air dryers for bop-i/stage-i/ytps.
Supply of nitrogen gas with new cylinders used in mellcon air dryers for bop-i/stage-i/ytps.
Read moreSupply of various measuring tools/instruments and gauges used in turbine division of unit-i and ii of ytps/stage-i
Supply of various measuring tools/instruments and gauges used in turbine division of unit-i and ii of ytps/stage-i
Read moreDesign, supply, erection, testing and commissioning of co2gas fire suppression system for umiam stage-i and umiam-umtru stage-iv power stations and refilling of the co2 cylinders along with complete overhauling of fire alarm system
Design, supply, erection, testing and commissioning of co2gas fire suppression system for umiam stage-i and umiam-umtru stage-iv power stations and refilling of the co2 cylinders along with complete overhauling of fire alarm system
Read moreDesign, supply, erection, testing and commissioning of co2gas fire suppression system for umiam stage-i and umiam-umtru stage-iv power stations and refilling of the co2 cylinders along with complete overhauling of fire alarm system
Design, supply, erection, testing and commissioning of co2gas fire suppression system for umiam stage-i and umiam-umtru stage-iv power stations and refilling of the co2 cylinders along with complete overhauling of fire alarm system
Read moreSupply of refrigirent gas type r-32 difluoromethane for split ac unit 1.5 tr inverter supply of refrigerant gas without cylinders type should be supplied in 08 kgs capacity cylender company sealed along with cylender on returnable basis. (returnable cylinder).
For complete deion and other details, please refer to tender
Read moreLifting and transporting of accumulated coal along the tracks of wagon tipplers 1-6 outhaul sides, road no.5,6,7,818(from point no.32a to point 66)(loading, transporting and unloading),to the uncrushed coal stock yard and cleaning testing of portable fire extinguishers(co-2 d.c.p. cylinders) kept at various locations once in month in chp/operation area at stage-iii and stage-iiiiv/dr.nttps for the period from 01.08.2025 to 31.03.2026
Lifting and transporting of accumulated coal along the tracks of wagon tipplers 1-6 outhaul sides, road no.5,6,7,818(from point no.32a to point 66)(loading, transporting and unloading),to the uncrushed coal stock yard and cleaning testing of portable fire extinguishers(co-2 d.c.p. cylinders) kept at various locations once in month in chp/operation area at stage-iii and stage-iiiiv/dr.nttps for the period from 01.08.2025 to 31.03.2026
Read moreof your Industry type