Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Nctps Ii Mi Circle Mi Circle Bm Dn Unit I Esp A B C D Passes Inspection Of Rectification
|
| Description |
Nctps Ii Mi Circle Mi Circle Bm Dn Unit I Esp A B C D Passes Inspection Of Rectification
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_622162_1 |
|
Reference Number |
CE NCTPS II SE M I O M 103 2025 26 |
| Tender Fee | 0 |
| EMD | 5000 |
| Tender Value | - |
| Place | SE MI NCTPS II |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=743941 |
| Start Date | November 11, 2025 19:30 |
| End Date |
Expired
26/11/2025
Expired 323 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Ttps mechii bm unit iii inspection rectification of emitting electrode suspension frame in esp during annual overhaul for the year 2026 2027
Ttps mechii bm unit iii inspection rectification of emitting electrode suspension frame in esp during annual overhaul for the year 2026 2027
Read moreNctps i se mi circle boiler maintenance division specification no 305 25 26
Tangedco nctps i 3x210mw installation of semi dry flue gas desulphurization system
Read moreNctps i es circle em i division s dn iii esp hot oil circulation of 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer and replacement of gaskets for in unit ii at nctps i
Nctps i es circle em i division s dn iii esp hot oil circulation of 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer and replacement of gaskets for in unit ii at nctps i
Read moreS.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system
S.55 nctps ii es circle em ii dn sdn iii charges towards rewinding of 25 nos of 37kw/0.5hp, 0415v 1390rpm rated lt rapping motors in unit i and ii esp system
Read moreNctps i se mi circle turbine maintenance division annual overhaul work for the year 26 27 specification no 113 26 27
Nctps i semi circle aoh 2627 tm dn unit i iii dismantling of unit 1 turbine bearing pedestal cover no4 unit 3 turbine bearing cover no2 inspection machining of oil guard sealing rings checking the jack oil hoses and replacement of damaged hoses if an
Read moreNctps i se mi circle turbine maintenance division annual overhaul work for the year 26 27 specification no 114 26 27
Nctps i semi circle aoh 26 27 tm dn unit i axial shift rectification dismantling, inspection and replacement of thrust bearing pads and correcting the axial float of the turbine during aoh for the year 202627
Read moreNctps i se mi circle boiler maintenance division annual overhaul work for the year 26 27 specification no 115 26 27
Nctps i semi circle aoh 2627bm dn unit i renewal of damaged acw line at 0mtr from boiler wall to mill area during annual overhaul 202627
Read moreNctps ii civil maintenance circle civil maintenance division repair and maintenance works in the compound wall in between nctps i ii at nctps ii
Nctps ii civil maintenance circle civil maintenance division repair and maintenance works in the compound wall in between nctps i ii at nctps ii
Read moreNctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Nctps i es circle em i division s dn iii esp hot oil circulation and replacement of all gaskets for 24 nos 75 kva 373 5 v 70 kv dc peak high voltage rectifier transformer in unit i during annual overhauling 2026 27
Read moreTtps mech ii bm unit i replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Ttps mech ii bm unit i replacement of wornout esp hopper lower part with hopper door renewal of wornout esp hopper upper part and providing insulation
Read moreof your Industry type