Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Conversion In Pipe Distribution Network Of Selected Minors On Lingnoor Branch Canal Km 1 To 15, Salagare Main Canal Km 1 To 10, Salgare Branch Canal Km 11 To 30, Kalambi Branch Canal Km 1 To 42, Khanderajuri Branch Canal Km 1 To 11 An
|
| Description |
Construction Of Conversion In Pipe Distribution Network Of Selected Minors On Lingnoor Branch Canal Km 1 To 15, Salagare Main Canal Km 1 To 10, Salgare Branch Canal Km 11 To 30, Kalambi Branch Canal Km 1 To 42, Khanderajuri Branch Canal Km 1 To 11 An
|
| Organisation | Government of Maharashtra |
| Tender Id | 2023_CWRDP_924464_1 |
|
Reference Number |
B-1/2 for 2023-24 |
| Tender Fee | 11800 |
| EMD | 38.5 Lakh |
| Tender Value | - |
| Place | sangli |
| Link |
View Original Tender Notice
https://mahatenders.gov.in |
| Start Date | July 12, 2023 17:30 |
| End Date |
Expired
01/08/2023
Expired 1152 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreRepair work of cross regulator gate and repair work of outlet gate of dy-1 of salgare main canal and construction of steel bridge (footbridge) on salgare main canal km 1 to 10 taluka - miraj dist - sangli
Repair work of cross regulator gate and repair work of outlet gate of dy-1 of salgare main canal and construction of steel bridge (footbridge) on salgare main canal km 1 to 10 taluka - miraj dist - sangli
Read moreImprovements with strengthening to khanderajuri erandoli bedag narwad mhaishal krishnaghat road mdr-103 km.0/400 to 1/800, 5/400 to 6/000, 9/850 to 13/200 (section- khanderajuri to erandoli, shingade wasti to canal, gurav wasti to mangsuli phata and
Improvements with strengthening to khanderajuri erandoli bedag narwad mhaishal krishnaghat road mdr-103 km.0/400 to 1/800, 5/400 to 6/000, 9/850 to 13/200 (section- khanderajuri to erandoli, shingade wasti to canal, gurav wasti to mangsuli phata and
Read moreImprovement and strengthenin to lingnoor kapashi madhyal gadhinglaj road mdr 51 km. 0/00 to 20/355 (km. 0.00 to 5.00_ 5.00 km) (part_ lingnoor kapashi to jainyal) tal. kagal dist. kolhapur
Improvement and strengthenin to lingnoor kapashi madhyal gadhinglaj road mdr 51 km. 0/00 to 20/355 (km. 0.00 to 5.00_ 5.00 km) (part_ lingnoor kapashi to jainyal) tal. kagal dist. kolhapur
Read moreKrishna koyna lift irrigation scheme - irrigation management of salgare main canal km. 1 to 10 during rotation and non rotation period for the year 2024-25
Krishna koyna lift irrigation scheme - irrigation management of salgare main canal km. 1 to 10 during rotation and non rotation period for the year 2024-25
Read moreKrishna koyna lift irrigation scheme - irrigation management and maintainance of lingnoor branch canal km. 1 to 15 during rotation and non rotation period for the yea
Krishna koyna lift irrigation scheme - irrigation management and maintainance of lingnoor branch canal km. 1 to 15 during rotation and non rotation period for the yea
Read moreImprovements to road from khanderajuri erandoli bedag narwad mhaishal krishnaghat mdr-103 (section khanderajuri erandoli to bedag 9.0 km) in tal-miraj, dist-sangli.
Improvements to road from khanderajuri erandoli bedag narwad mhaishal krishnaghat mdr-103 (section khanderajuri erandoli to bedag 9.0 km) in tal-miraj, dist-sangli.
Read moreEmergency repair work in gosikhurd right bank canal 1 to 33 km and b-1 branch canal 1 to 22.5 km.
Emergency repair work in gosikhurd right bank canal 1 to 33 km&#x0d and b-1 branch canal 1 to 22.5 km.
Read more23. impro to road salgare umadi jire ankalagi odr.199 at.umadi tal.jath km 1.500 to 2.000
23. impro to road salgare umadi jire ankalagi odr.199 at.umadi tal.jath km 1.500 to 2.000
Read more24. impro to road salgare umadi jire ankalagi odr 199 at.umadi tal.jath km 2.000 to 3.000
24. impro to road salgare umadi jire ankalagi odr 199 at.umadi tal.jath km 2.000 to 3.000
Read moreof your Industry type