Tender Details
Particulars | Details |
---|---|
Title |
Achara Dongrewadi Kharland Scheme Tal Malvan Dist. Sindhudurg. Restoration Of Bund From Ch. 1050 M To Ch. 1150 M And Renovation Of Cd Work At Ch.630 M.
|
Description |
Achara Dongrewadi Kharland Scheme Tal Malvan Dist. Sindhudurg. Restoration Of Bund From Ch. 1050 M To Ch. 1150 M And Renovation Of Cd Work At Ch.630 M.
|
Organisation | CE-Water Resources Dept. Konkan Region Mumbai | State Govt. and UT |
Tender Id | 2025_CWRDK_1159487_1 |
Reference Number |
KDDS/N7/SUBE/ ACHARA/ PARWADI/2025 |
Tender Fee | 2860 |
EMD | 40000 |
Tender Value | |
Place | ACHARA TAL MALVAN |
Link | https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2016656 |
Start Date | March 13, 2025 15:30 |
End Date |
20/03/2025 ( Expired 33 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Construction work of overhead line through 33 kv cable, dog conductor, 11 meter stp and 9 meter pcc pole from 220/33 kv s/s thathra (kachhwa) to the proposed s/s for energizing the 33/11 kv electrical substation proposed in transport nagar scheme.
Read moreWidening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Widening of narrow major bridge 2no to four lane configuration nh 548c section tembhurni to kuslamb at ch. 194.470 sina river bridge and ch. 197.125 widening of narrrow minor bridge 2 no at ch. 168.270 and ch. 180.525 and reconstruction of narrow m
Read moreNiet no. - 52 of the fy 2024-2025 of the ee/bqa, phe dte.(sl.no-01)
Restoration of work (for temporary and final closer) of a ghogh over the left bank of the kotulpur branch canal below the phe pipe line in between ch. 600.00 to 615.00 in mouza-hariharchak, g.p- mirjapur,p.s and block- kotulpur, dist- bankura
Read moreRenovation of crb and 69.30 mtr. tilted boundary wall with retaining wall (1.50 m height) and other ancillary civil work at joypur 33/11 kv sub-station under purulia division, dist. purulia.
Renovation of crb and 69.30 mtr. tilted boundary wall with retaining wall (1.50 m height) and other ancillary civil work at joypur 33/11 kv sub-station under purulia division, dist. purulia.
Read moreConstruction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Construction of infrastructure and other development work at 15,016 feet above msl, up to 6 feet snow accumulation in winter and the site distance is 189 km (168 km metaled and 21 km kucha road) from uttarkashi in harshil valley of 35th bn itb police
Read moreAAAAAAAAAA
Login to viewProtection work along&#x0d right bank of river padma&#x0d from house of islam uddin to bsf camera post (length 500m) at radhakrishnapur within g.p.- bilborakopara,&#x0d block and p.s.- lalgola,&#x0d dist. murshidabad
Read moreRepair/ renovation/ extension/ maintenance of field channel/ drains at work site tengnaan extension and khud daji extension in villae achgoza for a length of 250 mts. from rd 770-920 and 20-70 -- project sangarwani -- estimated cost rs. 659300 --
Repair/ renovation/ extension/ maintenance of field channel/ drains at work site tengnaan extension and khud daji extension in villae achgoza for a length of 250 mts. from rd 770-920 and 20-70 -- project sangarwani -- estimated cost rs. 659300 --
Read moreIe services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Ie services for o and m stage of 4 laning of dhangaon boregaon section of nh 347bg and 753l indore boregaon pkg iv from design ch. 81.000 to km. 139.000 length 58.00 km under bharatmala pariyojana phase i in the state of mp on ham
Read moreMonsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Monsoon preparednes and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iib (from rajol at km. 72.000 to thanpuri at km. 85.135) and package iii (from parour at km. 100.840 to chauntra at km. 140.6
Read moreMonsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Monsoon preparedness works and restoration works for maintenance of pathankot mandi national highway section of nh-154 in package iv from chauntra at km. 140.625 to padhar at km. 180.000 in the state of himachal pradesh on item rate percentage
Read moreof your Industry type