Tender Details

About Tender

๐Ÿ—๏ธ Electrification Work Bid Invitation For Eudd Iii, Aligarh ๐Ÿ—๏ธ Dakshinanchal Vidyut Vitaran Nigam Ltd., A State Government Undertaking, Invites Bids From Experienced Contractors For Electrification Work Under The Eudd Iii Project In Aligarh. ๐ŸŒŸ ๐Ÿ“… Bid Submission Deadline: July 11, 2024, 9:00 Am ๐Ÿ’ธ Tender Fee: Inr 1180 ๐Ÿ’ฐ Earnest Money Deposit (Emd): Inr 10000 Interested Bidders Should Submit Detailed Proposals, Including Technical Capabilities, Financial Bids, And Project Execution Timelines, In Accordance With The Project Specifications And Government Procurement Guidelines. Keywords: Electrification Work, Eudd Iii, Aligarh, Dakshinanchal Vidyut Vitran Nigam Ltd, State Govt. And Ut, Tender, Bid, Infrastructure Development
Particulars Details
Title
Electrification Work Against Packages To Be Sanctioned Under Deposit Head In The Area Of Eudd Iii, Aligarh
Description
Electrification Work Against Packages To Be Sanctioned Under Deposit Head In The Area Of Eudd Iii, Aligarh
Organisation Dakshinanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT
Tender Id 2024_DVVNL_933893_1
Reference
Number
EUDCA-07/2024-25
Tender Fee 1180
EMD 10000
Tender Value
Place EUDD-3 ALIGARH
Link https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1629203
Start Date July 27, 2024 20:30
End Date

07/08/2024 ( Expired 288 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii

Read more
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode

Read more
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate

Read more
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.

Read more
Repair to certain internal road and connected items in the area of age br i under ge gwalior

Repair to certain internal road and connected items in the area of age br i under ge gwalior

Read more
Area development of dandeshwar pavilion complex at jageshwar dham in district almora under master plan. (civil work)

Area development of dandeshwar pavilion complex at jageshwar dham in district almora under master plan. (civil work)

Read more
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand

Read more
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)

Read more
Repairs to road and road side furniture work at omq billets, otm area, bundela enclave, dilbag enclave and mes colony under age b/r ii, ge (af) no 2 jodhpur

Repairs to road and road side furniture work at &#x0d omq billets, otm area, bundela enclave, dilbag &#x0d enclave and mes colony under age b/r ii, ge (af) &#x0d no 2 jodhpur

Read more
Zonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021

Zonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise