Tender Details
About Tender
๐๏ธ Electrification Work Bid Invitation For Eudd Iii, Aligarh ๐๏ธ Dakshinanchal Vidyut Vitaran Nigam Ltd., A State Government Undertaking, Invites Bids From Experienced Contractors For Electrification Work Under The Eudd Iii Project In Aligarh. ๐ ๐ Bid Submission Deadline: July 11, 2024, 9:00 Am ๐ธ Tender Fee: Inr 1180 ๐ฐ Earnest Money Deposit (Emd): Inr 10000 Interested Bidders Should Submit Detailed Proposals, Including Technical Capabilities, Financial Bids, And Project Execution Timelines, In Accordance With The Project Specifications And Government Procurement Guidelines. Keywords: Electrification Work, Eudd Iii, Aligarh, Dakshinanchal Vidyut Vitran Nigam Ltd, State Govt. And Ut, Tender, Bid, Infrastructure DevelopmentParticulars | Details |
---|---|
Title |
Electrification Work Against Packages To Be Sanctioned Under Deposit Head In The Area Of Eudd Iii, Aligarh
|
Description |
Electrification Work Against Packages To Be Sanctioned Under Deposit Head In The Area Of Eudd Iii, Aligarh
|
Organisation | Dakshinanchal Vidyut Vitran Nigam Ltd. | State Govt. and UT |
Tender Id | 2024_DVVNL_933893_1 |
Reference Number |
EUDCA-07/2024-25 |
Tender Fee | 1180 |
EMD | 10000 |
Tender Value | |
Place | EUDD-3 ALIGARH |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1629203 |
Start Date | July 27, 2024 20:30 |
End Date |
07/08/2024 ( Expired 288 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Ie services during o and m period for 4 laning of berhampore farakka section of nh-12 (old nh-34) from km 191.700 to km 292.300 in the state of west bengal on dbfot toll basis under nhdp phase-iii
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreRepair to certain internal road and connected items in the area of age br i under ge gwalior
Repair to certain internal road and connected items in the area of age br i under ge gwalior
Read moreArea development of dandeshwar pavilion complex at jageshwar dham in district almora under master plan. (civil work)
Area development of dandeshwar pavilion complex at jageshwar dham in district almora under master plan. (civil work)
Read moreRoutine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Routine maintenance and incident management work of from sitarganj km 0 000 to tanakpur km 52 200 under nhdp iv on epc mode of two lane with paved shoulders of section of old nh 125 new nh 09 in the state of uttarakhand
Read moreDevelopment of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Development of 4-lane access controlled gf regional expressway on northern side of hyderabad from islampur village (design ch.59.000) to pragnapur village (design ch.82.000) length of 23.000 km in telangana under nh(o) on epc mode (package-iii)
Read moreRepairs to road and road side furniture work at omq billets, otm area, bundela enclave, dilbag enclave and mes colony under age b/r ii, ge (af) no 2 jodhpur
Repairs to road and road side furniture work at 
 omq billets, otm area, bundela enclave, dilbag 
 enclave and mes colony under age b/r ii, ge (af) 
 no 2 jodhpur
Read moreZonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Zonal work ward 13 to 24 under area of nagar palika barwani such as nali,nali crossing,rcc pipe laying,paver work,chamber of drainage and water works,repair work,etc on uadd sor 2021
Read moreof your Industry type