Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Work Contract For Survey Of Flora And Fauna For The Site Of Ash Disposal In Abandoned Sarni Ug Coal Mine Of Wcl As Per Guidelines Of Mo Ef And Cc And Cpcb.
|
| Description |
Work Contract For Survey Of Flora And Fauna For The Site Of Ash Disposal In Abandoned Sarni Ug Coal Mine Of Wcl As Per Guidelines Of Mo Ef And Cc And Cpcb.
|
| Organisation | Madhya Pradesh Power Generating Company Limited | State Govt. and UT |
| Tender Id | 2025_MPPGC_423807_1 |
|
Reference Number |
WT4915 |
| Tender Fee | 795 |
| EMD | 5200 |
| Tender Value | - |
| Place | WORKS |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=550399 |
| Start Date | December 13, 2025 17:45 |
| End Date |
Expired
09/01/2026
Expired 277 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Work contract for pre and post monitoring work e.g. air,water,soil, flora and fauna etc at around abandoned mine nearest rescue colony(deori) distt anuppur various samples monitoring during disposal of fly/ pond ash at atps chachai
Work contract for pre and post monitoring work e.g. air,water,soil, flora and fauna etc at around abandoned mine nearest rescue colony(deori) distt anuppur various samples monitoring during disposal of fly/ pond ash at atps chachai
Read moreWork contract of monitoring enviromental parameters during ash disposal in the sarni underground coal mine of wcl
Work contract of monitoring enviromental parameters during ash disposal in the sarni underground coal mine of wcl
Read moreProviding watch and ward and operation of system for ash utilization by filling of ash water of unit no 10 and 11 ph 4 stps sarni in sarni underground mines of wcl ,pathakhera
Providing watch and ward and operation of system for ash utilization by filling of ash water of unit no 10 and 11 ph 4 stps sarni in sarni underground mines of wcl ,pathakhera
Read moreAssessment and regular monitoring of flora and fauna, fisheries andbottom sediments of the rihand reservoir and to assess the impact of ashpond effluents/ash content of ntpc units of vstps and sstps
Assessment and regular monitoring of flora and fauna, fisheries andbottom sediments of the rihand reservoir and to assess the impact of ashpond effluents/ash content of ntpc units of vstps and sstps
Read moreTransportation with loading of coal from sharda ug mine (kanhan area, m/s wcl) to stps, sarni using completely covered and sealed tipper/trucks, and unloading at the coal yard at mppgcl, sarni.
Transportation with loading of coal from sharda ug mine (kanhan area, m/s wcl) to stps, sarni using completely covered and sealed tipper/trucks, and unloading at the coal yard at mppgcl, sarni.
Read moreAnnual compliance audit report for ash utilization in the fy 2022-23 and 2023-24 of the dstps andal, dvc conducted by authorized auditors of(cpcb) and the report submitted to cpcb and spcb as per moef and cc guideline.
Annual compliance audit report for ash utilization in the fy 2022-23 and 2023-24
 of the dstps andal, dvc conducted by authorized auditors of(cpcb) and the report submitted to cpcb and spcb as per moef and cc guideline.
Read moreTransportation with loading of coal from sharda ug of kanhan area mine of m/s wcl to stps, sarni by contractor in completely covered and sealed tippers/trucks and unloading the coal in coal yard at mppgcl, sarni.
Transportation with loading of coal from sharda ug of kanhan area mine of m/s wcl to stps, sarni by contractor in completely covered and sealed tippers/trucks and unloading the coal in coal yard at mppgcl, sarni.
Read moreTransportation with loading of coal from sharda ug of kanhan area mine of m/s wcl to stps, sarni by contractor in completely covered and sealed tippers/trucks and unloading the coal in coal yard at mppgcl, sarni.
Transportation with loading of coal from sharda ug of kanhan area mine of m/s wcl to stps, sarni by contractor in completely covered and sealed tippers/trucks and unloading the coal in coal yard at mppgcl, sarni.
Read moreConstruction of 09 nos complete and 03 nos preparatory complete isolation stoppings (fly ash bricks) including all materials in cm panel no 5 lws ug at tawa 2 mine, pathakhera area, wcl
Construction of 09 nos complete and 03 nos preparatory complete isolation stoppings (fly ash bricks) including all materials in cm panel no 5 lws ug at tawa 2 mine, pathakhera area, wcl
Read moreConstruction of 15 nos ventilation stopping (fly ash bricks) including all materials in 33dn to 40dn between 7ln-8ln and 48dn to 52dn between 7ln-8ln cm panel no 5 in lws ug at tawa 2 mine, pathakhera area, wcl
Construction of 15 nos ventilation stopping (fly ash bricks) including all materials in 33dn to 40dn between 7ln-8ln and 48dn to 52dn between 7ln-8ln cm panel no 5 in lws ug at tawa 2 mine, pathakhera area, wcl
Read moreof your Industry type