Tender Details
Particulars | Details |
---|---|
Title |
Construction Of 09 Nos Complete And 03 Nos Preparatory Complete Isolation Stoppings (Fly Ash Bricks) Including All Materials In Cm Panel No 5 Lws Ug At Tawa 2 Mine, Pathakhera Area, Wcl
|
Description |
Construction Of 09 Nos Complete And 03 Nos Preparatory Complete Isolation Stoppings (Fly Ash Bricks) Including All Materials In Cm Panel No 5 Lws Ug At Tawa 2 Mine, Pathakhera Area, Wcl
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_WCL_284141_1 |
Reference Number |
PK3550-E-MIN-0037-2023-24 |
Tender Fee | |
EMD | 43200 |
Tender Value | |
Place | OFFICE OF THE STAFF OFFICER MINING GM OFFICE PATHA |
Link | https://coalindiatenders.nic.in |
Start Date | July 25, 2023 22:30 |
End Date |
05/08/2023 ( Expired 662 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Contractual work of transportation and installation of 03 nos drive heads in ug at chhatarpur mine no.1 of pathakhera area.
Contractual work of transportation and installation of 03 nos drive heads in ug at chhatarpur mine no.1 of pathakhera area.mine no1 of pathakhera area
Read moreDust suppression by spraying work for every blasting in all running ug faces of running districts (w5 a, w5 b , w7 b etc.) at lws at chhatarpur mine no. 1, pathakhera area, wcl
Dust suppression by spraying work for every blasting in all running ug faces of running districts (w5 a, w5 b , w7 b etc.) at lws at chhatarpur mine no. 1, pathakhera area, wcl
Read moreHydraulic roof bolting with resin capsules by contractual means with providing 5 nos dgms approved hydraulic roof bolting machine in the panel w 5a and w 5b of lower workable seam at chhatarpur mine no 1, pathakhera area, wcl
Hydraulic roof bolting with resin capsules by contractual means with providing 5 nos dgms approved hydraulic roof bolting machine in the panel w 5a and w 5b of lower workable seam at chhatarpur mine no 1, pathakhera area, wcl
Read moreAssistance required for dust suppression in all running faces in district of lws and bagdona seam at tawa-ii mine, pathakhera area, wcl
Assistance required for dust suppression in all running faces in district of lws and bagdona seam at tawa-ii mine, pathakhera area, wcl
Read moreTransportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Transportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Read moreTransport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Transport of material like roof bolts with nuts and bearing plates ,w- straps resin capsule, stemming material , stone dust from surface to all running districts in ug panel of l.w.s at chhatarpur mine no.1, pathakhera area, wcl
Read moreRemoval of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Removal of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Read moreDismantling, loading, transportation and unloading of below mentioned items from one location to other location for the preparation of 29d-ii depillaring district in lws of tawa-ii mine, pathakhera area. a) 03 no. 90kw, 1200mm belt conveyor complete
Dismantling, loading, transportation and unloading of below mentioned items from one location to other location for the preparation of 29d-ii depillaring district in lws of tawa-ii mine, pathakhera area. a) 03 no. 90kw, 1200mm belt conveyor complete
Read moreConstruction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area
Construction of 43 nos. of rcc sectionalisation stoppings (26 nos. rcc sectionalisation preparatory stoppings and 17 nos. rcc sectionalisation stoppings) in seam iv (b) and seam iv (m) and seam v of saoner mine no. 2, nagpur area
Read moreInstallation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Installation of 01 no. endless haulage, 01 no. direct haulage and laying of haulage track line with packing to facilitate material transportation for depillaring of cm-4a, cm-4b, cm-5 panel of l-1b seam at vindhya ug mine, pinoura sub area, johilla
Read moreof your Industry type