Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Independent Engineer Services During Oand M Period For The Project Of Four Laning Of Biaora To Dewas Section From Km 426.100 To Km 566.450 Of Nh52 In The State Of Madhya Pradesh Under Nhdp Phase Iv In Bot Toll On Dbfot Basis
|
| Description |
Independent Engineer Services During Oand M Period For The Project Of Four Laning Of Biaora To Dewas Section From Km 426.100 To Km 566.450 Of Nh52 In The State Of Madhya Pradesh Under Nhdp Phase Iv In Bot Toll On Dbfot Basis
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2023_NHAI_179306_1 |
|
Reference Number |
- |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | NHAI RO Bhopal |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=196319 |
| Start Date | December 27, 2023 00:25 |
| End Date |
Expired
12/02/2024
Expired 976 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
Read moreConsultancy services as independent engineer during operation and maintenance of 4 laning of goa karnataka border to kundapur section of nh 66 from km 93.7 to km 283.3 in karnataka on bot toll basis 2nd call
Consultancy services as independent engineer during operation and maintenance of 4 laning of goa karnataka border to kundapur section of nh 66 from km 93.7 to km 283.3 in karnataka on bot toll basis 2nd call
Read moreCs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Cs as ie during o and m for 6 laning of i chitradurga davanagere including chitradurga bypass and ii davanagere to haveri section of nh 48 old nh4 in the state of karnataka under dbfot under nhdp phase v on ham mode
Read moreCs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Read moreIndependent engineer services during operation maintenance stage for 4 laning of guna biaora section from km. 223.130 to km. 316.630 of nh-46 old nh 3 in the state of mp on bot toll on dbfot pattern under nhdp phase iv
Independent engineer services during operation maintenance stage for 4 laning of guna biaora section from km. 223.130 to km. 316.630 of nh-46 old nh 3 in the state of mp on bot toll on dbfot pattern under nhdp phase iv
Read moreIndependent engineer services during o-m period of 6l samakhiyali-gandhidham section nh-8a from km 306.000 to km 362.160 in the state of gujarat d as bot (toll) on dbfot under nhdp phase v.
Independent engineer services during o-m period of 6l samakhiyali-gandhidham section nh-8a from km 306.000 to km 362.160 in the state of gujarat d as bot (toll) on dbfot under nhdp phase v.
Read moreIndependent engineer services for operation and maintenance stage of 4laning of indore gujarat mp border on bot toll basis from km. 9.500 to km. 171.000 of nh59 on dbfot in the state of mp under nhdp phaseiii
Independent engineer services for operation and maintenance stage of 4laning of indore gujarat mp border on bot toll basis from km. 9.500 to km. 171.000 of nh59 on dbfot in the state of mp under nhdp phaseiii
Read moreIndependent engineer services during o andd m period of 4 lane shivpuri guna including guna bypass section of nh 46 from km 125.430 to km 223.130 total length 97.700 km under dbfot pattern bot toll mode nhdp phase iv
Independent engineer services during o andd m period of 4 lane shivpuri guna including guna bypass section of nh 46 from km 125.430 to km 223.130 total length 97.700 km under dbfot pattern bot toll mode nhdp phase iv
Read moreIndependent engineer services during operation maintenance period for 2 laning with paved shoulder of agra to aligarh section of nh93 from km 000 to km 7900 in the state of uttar pradesh on dbfot on toll basis under nhdp phaseiva
Independent engineer services during operation maintenance period for 2 laning with paved shoulder of agra to aligarh section of nh93 from km 000 to km 7900 in the state of uttar pradesh on dbfot on toll basis under nhdp phase iv a
Read moreIndependent engineer services during operation maintenance period for 2 laning with paved shoulder of agra to aligarh section of nh93 from km 000 to km 7900 in the state of uttar pradesh on dbfot on toll basis under nhdp phaseiva
Independent engineer services during operation maintenance period for 2 laning with paved shoulder of agra to aligarh section of nh93 from km 000 to km 7900 in the state of uttar pradesh on dbfot on toll basis under nhdp phaseiva
Read moreof your Industry type