Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Independent Engineer Services During O M Period Of 6 L Samakhiyali Gandhidham Section Nh 8 A From Km 306.000 To Km 362.160 In The State Of Gujarat D As Bot (Toll) On Dbfot Under Nhdp Phase V.
|
| Description |
Independent Engineer Services During O M Period Of 6 L Samakhiyali Gandhidham Section Nh 8 A From Km 306.000 To Km 362.160 In The State Of Gujarat D As Bot (Toll) On Dbfot Under Nhdp Phase V.
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2024_NHAI_183067_1 |
|
Reference Number |
NHAI/RO-GNR/Sam-Gan/IE/OM/2024 |
| Tender Fee | 5000 |
| EMD | 0 |
| Tender Value | - |
| Place | NHAI, Regional Office, Gandhinagar |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=200440 |
| Start Date | January 25, 2024 19:30 |
| End Date |
Expired
04/03/2024
Expired 955 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
Widening of service road from km. 265.500 to km. 279.750 on four lane raipur-aurang section from km.239.000 to km. 282.000 of nh-6 (new nh-53) as bot (toll) on dbfot pattern under nhdp iv on epc mode
Read moreIe services for (pkg-2) cons.of 6l access controlled greenfield highway from ahilyanagar (km 290.000) to hasapur (km 512.000) in the state of maharashtra on bot (toll) mode 2nd call
Ie services for (pkg-2) cons.of 6l access controlled greenfield highway from ahilyanagar (km 290.000) to hasapur (km 512.000) in the state of maharashtra on bot (toll) mode 2nd call
Read moreConsultancy services as independent engineer during operation and maintenance of 4 laning of goa karnataka border to kundapur section of nh 66 from km 93.7 to km 283.3 in karnataka on bot toll basis 2nd call
Consultancy services as independent engineer during operation and maintenance of 4 laning of goa karnataka border to kundapur section of nh 66 from km 93.7 to km 283.3 in karnataka on bot toll basis 2nd call
Read moreIe for (pkg1) dev of 6l access controlled greenfield highway starting from junction with nh-60 at adgaon (km. 138.00) to ahilyanagar (km. 290.000) to start of ahilyanagar bypass (km. 126.564) of nh-160 in maharashtra on bot (toll) mode 2nd call
Ie for (pkg1) dev of 6l access controlled greenfield highway starting from junction with nh-60 at adgaon (km. 138.00) to ahilyanagar (km. 290.000) to start of ahilyanagar bypass (km. 126.564) of nh-160 in maharashtra on bot (toll) mode 2nd call
Read moreCs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Cs for independent engineer for widening and upgradation of existing highway from khagaria design ch.270.000 to purnea ch.413.529 section of nh31-nh231 to 4 lane with paved shoulder under nho on bot (toll) in the state of bihar (2nd call)
Read moreIndependent engineer services for operation and maintenance stage of 4laning of indore gujarat mp border on bot toll basis from km. 9.500 to km. 171.000 of nh59 on dbfot in the state of mp under nhdp phaseiii
Independent engineer services for operation and maintenance stage of 4laning of indore gujarat mp border on bot toll basis from km. 9.500 to km. 171.000 of nh59 on dbfot in the state of mp under nhdp phaseiii
Read moreIndependent engineer services during o andd m period of 4 lane shivpuri guna including guna bypass section of nh 46 from km 125.430 to km 223.130 total length 97.700 km under dbfot pattern bot toll mode nhdp phase iv
Independent engineer services during o andd m period of 4 lane shivpuri guna including guna bypass section of nh 46 from km 125.430 to km 223.130 total length 97.700 km under dbfot pattern bot toll mode nhdp phase iv
Read moreIndependent engineer services during operation maintenance stage for 4 laning of guna biaora section from km. 223.130 to km. 316.630 of nh-46 old nh 3 in the state of mp on bot toll on dbfot pattern under nhdp phase iv
Independent engineer services during operation maintenance stage for 4 laning of guna biaora section from km. 223.130 to km. 316.630 of nh-46 old nh 3 in the state of mp on bot toll on dbfot pattern under nhdp phase iv
Read moreIndependent engineer services during oandm period for the project of four laning of biaora to dewas section from km 426.100 to km 566.450 of nh52 in the state of madhya pradesh under nhdp phaseiv in bot toll on dbfot basis
Independent engineer services during oandm period for the project of four laning of biaora to dewas section from km 426.100 to km 566.450 of nh52 in the state of madhya pradesh under nhdp phaseiv in bot toll on dbfot basis
Read moreIndependent engineering services during operation maintenance period for 4lane jammu udhampur section of nh44 from km 15.00 jammu bypass to km 67.00 on bot annuity on dbfot pattern in jammu kashmir under nhdp phase ii
Independent engineering services during operation maintenance period for 4lane jammu udhampur section of nh44 from km 15.00 jammu bypass to km 67.00 on bot annuity on dbfot pattern in jammu kashmir under nhdp phase ii
Read moreof your Industry type