Tender Details
Particulars | Details |
---|---|
Title |
Widening And Strengthening Work Of Road From Km 150 Of Farenda Jarwal Marg (Nh 330) On Right Side Via Block Headquarters, Bus Stand Till Nh 730 (Jharkhandi Mandir)
|
Description |
Widening And Strengthening Work Of Road From Km 150 Of Farenda Jarwal Marg (Nh 330) On Right Side Via Block Headquarters, Bus Stand Till Nh 730 (Jharkhandi Mandir)
|
Organisation | Chief Engineer Devipatan (Gonda) Zone PWD Gonda | State Govt. and UT |
Tender Id | 2025_CEDPW_1014109_1 |
Reference Number |
1028/2Com(b)-Gonda Circle/24-25 Dt. 22.02.25 |
Tender Fee | 11800 |
EMD | 13.4 Lakh |
Tender Value | |
Place | BALRAMPUR |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1825116 |
Start Date | March 05, 2025 19:30 |
End Date |
25/03/2025 ( Expired 28 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Services of ie for widening, reconstruction and up-gradation to 2lps for the work of junnar- ghodegaon - taleghar road (nh-61 spur) from km 13-880 to km 69-820 (design length -55.940 km) in the state of maharashtra on hybrid annuity mode.
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreEstimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Estimate balance work under risk and cost for rehabilitation and upgradation of aurangabad jalgaon road nh 753f section iii fardapur jalgaon from km 99 660 to km 144 750 to four lanes with earthen shoulder configuration in the state of maharashtra on
Read moreSc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan
Sc services for strengthening or overlay and operation and maintenance work on kota baran section of nh 27 from km 1080.263 to km 1184.322 (length 104.059 km) in the state of rajasthan
Read moreRoad improvement work through construction of side track and hotmix from bhasin traders on mini bypass road in ward-46 via college gate no.-02 to the main gate of ramlila ground.
Road improvement work through construction of side track and hotmix from bhasin traders on mini bypass road in ward-46 via college gate no.-02 to the main gate of ramlila ground.
Read moreConsultancy services for preparation of detailed project report for widening and strengthening from km 327.700 to km 413.700 and km 429.700 to km 513.700 on nh-326 in the state of odisha under annual plan 2024-25
Consultancy services for preparation of detailed project report for widening and strengthening from km 327.700 to km 413.700 and km 429.700 to km 513.700 on nh-326 in the state of odisha under annual plan 2024-25
Read moreDevelopment of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.
Development of road length approx. 2.30 km from innao tiniali to well no. kmc 01 via kumchai eps by providing and laying 80 mm thick interlocking concrete paver block grade m30 with preparation of base course by 100 mm gsb and 150 mm wbm including supply of all materials except cement.
Read moreWidening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Widening of existing 2l, ps road to 4 lane with paved shoulder from km 69/750 to km 75/750 kushthla sawai madhopur section of nh 552 extn on epc mode under annual plan 2024-25 in the state of rajasthan. job no. nh552extn. rj / 2024-25/861
Read moreStrengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore - villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu
Strengthening from km 22/0 to 78/0 of nh-38 (length54.223km) (mangalore-villupuram road) on epc mode in tamil nadu on epc basis contract under annual plan 2024-2025 in tamil nadu
Read moreWidening and strengthning of raisinghnagar-padampur road from village 20 ps bus stand to sri ganganagar-suratgarh highway via ridmalsar km 0/00-25/00
Widening and strengthning of raisinghnagar-padampur road from village 20 ps bus stand to sri ganganagar-suratgarh highway via ridmalsar km 0/00-25/00
Read moreof your Industry type