Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I M I Ca Cws I Renewal Replacement Of Most Corroded And Eroded Pipes Of Various Sizes In The Existing Hot Water Header Line And Allied Works
|
| Description |
Mtps I M I Ca Cws I Renewal Replacement Of Most Corroded And Eroded Pipes Of Various Sizes In The Existing Hot Water Header Line And Allied Works
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2024_EB_490035_1 |
|
Reference Number |
CE / MTPS-I / SE / M-I / CA /OT. 208 / 2024-25 |
| Tender Fee | 0 |
| EMD | 9200 |
| Tender Value | - |
| Place | Mettur Thermal Power Station-I / Mettur Dam |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=582245 |
| Start Date | October 01, 2024 18:30 |
| End Date |
Expired
15/10/2024
Expired 729 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii
Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii
Read moreMtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Mtps i ca cws i overhauling of sludge disposal pump and cold and hot water tunnel vent valves air vent valves and gate valves including painting of ct safety grills inside the fan stack area etc
Read moreMtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27
Mtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27
Read moreMtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Read moreMtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreMtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc
Mtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc
Read moreMtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Mtps i mill plant unit ii patch welding of eroded portion of hot air ducts joints and coal mill 2a to 2f vertical inlet area above the horizontal area and below the expansion joint providing insulation for pa inlet duct in coal mills 2a to 2f during
Read moreMtps i ca cws i renewal replacement of most corroded and eroded pipes of various sizes in the existing hot water header line in cooling tower i during aoh 2024 2025 of unit i
Mtps i ca cws i renewal replacement of most corroded and eroded pipes of various sizes in the existing hot water header line in cooling tower i during aoh 2024 2025 of unit i
Read moreMtps i ca cws i renewal replacement of most corroded and eroded pipes of various sizes in the existing hot water header line in cooling tower ii during aoh 2023 2024 of unit ii
Mtps i ca cws i renewal replacement of most corroded and eroded pipes of various sizes in the existing hot water header line in cooling tower ii during aoh 2023 2024 of unit ii
Read moreof your Industry type