Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Mtps I Ca Cws I Renewal Replacement Of Most Corroded And Eroded Pipes Of Various Sizes In The Existing Hot Water Header Line In Cooling Tower Ii During Aoh 2023 2024 Of Unit Ii
|
| Description |
Mtps I Ca Cws I Renewal Replacement Of Most Corroded And Eroded Pipes Of Various Sizes In The Existing Hot Water Header Line In Cooling Tower Ii During Aoh 2023 2024 Of Unit Ii
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_EB_369212_1 |
|
Reference Number |
CE/MTPS-I / SE / M-I / CA / OT.309 /2023-24 |
| Tender Fee | 0 |
| EMD | 7200 |
| Tender Value | - |
| Place | Office of the Superintending Engineer /M-I/MTPS-I |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | September 12, 2023 22:30 |
| End Date |
Expired
18/09/2023
Expired 1123 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii
Mtps i ca cws i overhauling of traction drive and flocculator drive gear box in clarifier ii and painting of hot water header pipes in cooling tower ii during aoh 2026 2027 of unit ii
Read moreMtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Mtps i m i ca cws i cooling tower ii overhauling of flow control valves and including reconditioning of released fcv spares during aoh 2026 2027 of unit ii
Read moreMtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27
Read moreMtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27
Mtps i ca cws i de watering complete cleaning and sludge removal cleaning with bleaching powder painting the structure of clarifier ii during aoh 2026 27
Read moreMtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Mtps i mill plant unit ii overhauling of classifier assemblies replacement repairing of eroded inner cone inner cone drum section venture vanes venturi collars during aoh 2026 27
Read moreMtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Mtps i tm unit ii replacing the defective eroded drip line reducers expanders changing the defective eroded plug broken 1 and 2 drain line and vent line valves pipes bends by ibr and non ibr welding transporting the variable load hanger etc
Read moreMtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27
Read moreMtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Mtps i bm unit ii boiler pressure parts aoh 2026 strengthening of eco hopper supports with new pipes and arresting of ash leakage in pent house after removal of ash from boiler inside
Read moreMtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc
Mtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc
Read moreMtps i ca cws i renewal replacement of most corroded and eroded pipes of various sizes in the existing hot water header line in cooling tower i during aoh 2024 2025 of unit i
Mtps i ca cws i renewal replacement of most corroded and eroded pipes of various sizes in the existing hot water header line in cooling tower i during aoh 2024 2025 of unit i
Read moreof your Industry type