Tender Details

Particulars Details
Title
Access Controlled Highway Of 4 L With Paved Shoulder From Ap/Kn Border (Dc. 0.000) To Mittimalkapur (Dc. 23.500) In Ap/Kn Border Raichur Kn/Ts Border Sec Of Nh167 In Karnataka On Ham Under Nh(o) Project Length 23.5 Km (Pkg 1)
Description
Access Controlled Highway Of 4 L With Paved Shoulder From Ap/Kn Border (Dc. 0.000) To Mittimalkapur (Dc. 23.500) In Ap/Kn Border Raichur Kn/Ts Border Sec Of Nh167 In Karnataka On Ham Under Nh(o) Project Length 23.5 Km (Pkg 1)
Organisation National Highways Authority of India | Public Sector Undertakings
Tender Id 2024_NHAI_201393_1
Reference
Number
NHAI/KNT/AP KN Border/KN TS Border/Main work/2024/Pkg1
Tender Fee 60000
EMD 5.96 Crore
Tender Value
Place NHAI HQ
Link https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=220355
Start Date July 15, 2024 18:30
End Date

26/12/2024 ( Expired 115 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Construction of 2-lane with paved shoulder of ashapur to rudhy (betul-khandwa pkg-iv) from design ch. km 114.000 to km 149.000 section in state of mp on epc mode under nh(o) (project length-35 km)

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 286.200 to km 313.700 of nh 39 (churhat to sidhi section design length 27.500 km) under nh(o) in madhya pradesh on ham.

Read more
Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Widening of existing 2 lane to 4 lane divided carriageway with paved shoulder from km 239.400 to km 271.000 of nh 39 (rewa to churhat tunnel north portal excluding churhat tunnel-design length 31.60 km) under nh(o) in madhya pradesh on ham

Read more
Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Construction of 4 lane with paved shoulder from ap/kn border (des. ch.0.000) to deosugur (des ch.54.566) of ap-kn border raichur-kn-ts border of nh-167 in the state of karnataka on ham under nh(o) (project length-54.566 km)

Read more
Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Widening of exist 2lane to 4 lane divided carriageway with paved shoulder from km 0.000 near deshgaon to km 51.579 (ex km 77.500 on sh26)of nh 347b near dewalgaon (l51.579kms)under nh(o) in madhya pradesh on ham

Read more
Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Ie for construction of 6 lane zirakpur bypass (starting from junction with nh7 (zirakpur patiala) (dc 0.000) and ending at junction with nh5 (zirakpur parwanoo) (dc 16.800) (total length 19.200 km) in punjab and haryana under nh(o) on ham

Read more
Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made

Upgradation and construction of multai to mh border road section of nh-347a from design chainage 0.000 to 23.94 km (total length 23.94 km) to 2l with paved shoulder configuration along with one time improvement in 5.80 km length in the state of made

Read more
Construction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham

Construction of new 4 lane with paved shoulder from dareota village to kalar bala village of nh-205 (design chainage km.33.175 to km 41.000 design length 7.825 km) including twin tube tunnel packageiib in himachal pradesh under nh (o) on ham

Read more
Const. of 4lane highway from dc km 0.000 to dc km 35.725 (ec km 1.705 to chainage km 34.446)on the section of nh927 in uttar pradesh on ham mode under nh(o) scheme.

Const. of 4lane highway from dc km 0.000 to dc km 35.725 (ec km 1.705 to chainage km 34.446)on the section of nh927 in uttar pradesh on ham mode under nh(o) scheme.

Read more
Const. of 4 lane access controlled gf highway from litibeda to kereya sec (nh 143h) from ch. 0.000 to design ch. 28.953 l28.953 km on ham in the state of odisha pkg i

Const. of 4 lane access controlled gf highway from litibeda to kereya sec (nh 143h) from ch. 0.000 to design ch. 28.953 l28.953 km on ham in the state of odisha pkg i

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise