Tender Details

Particulars Details
Title
Repair Maint Of Externalwater Supply In Op/Np Area And Repair To Swimming Pool And Allied Works At Af Station Gorakhpur
Description
Repair Maint Of Externalwater Supply In Op/Np Area And Repair To Swimming Pool And Allied Works At Af Station Gorakhpur
Organisation Defence eProcurement Portal
Tender Id 2023_MES_606731_1
Reference
Number
9063/E8
Tender Fee 500
EMD 80000
Tender Value
Place GE(AF) GORAKHPUR
Link https://defproc.gov.in
Start Date July 15, 2023 14:30
End Date

29/07/2023 ( Expired 694 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Provn of balance accn relating to baffle ranges alongwith allied works at akhnoor under ge (n) akhnoor

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district

Read more
Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Door to door maintenance of e/m and allied work at mil stn beas under ge kapurthala.

Read more
Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Design, supply, installation, testing and commissioning of ballastless, ballasted track, fastening system and turnouts from chainage (-) 635 to chainage 46,985 m from heelalige to rajanukunte in corridor 4 of bsrp

Read more
Repair and maintenance of koderma meghatari jh bh border section of nh 20 old nh 31 from km 27.700 to km 47.700 in the state of jharkhand

Repair and maintenance of koderma meghatari jh bh border section of nh 20 old nh 31 from km 27.700 to km 47.700 in the state of jharkhand

Read more
Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Construction of balance works in tiger corridor and provision of mitigation measures structures in itarsi betul section of nh-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in madhya pradesh on epc mode.

Read more
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Read more
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise