Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair And Strengthening Of Concrete Pavement At Both Sides Of Railway Of Track Hopper 2 X 210.00 M X 4.60 M At Ktps
|
| Description |
Repair And Strengthening Of Concrete Pavement At Both Sides Of Railway Of Track Hopper 2 X 210.00 M X 4.60 M At Ktps&Amp#X0d
&Amp#X0d
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2024_WBPDC_661431_1 |
|
Reference Number |
WBPDCL/KTPS/NIT/E2896/23-24 |
| Tender Fee | 0 |
| EMD | 42996 |
| Tender Value | - |
| Place | KTPS,Mecheda,Purba Medinipur |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1432720 |
| Start Date | March 06, 2024 16:30 |
| End Date |
Expired
20/03/2024
Expired 938 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Strengthening of main burari road from orr to labour chowk (lhs only), labour chowk to baba colony both sides and nathupura to hirnki both sides and redevelopment of road with cc pavement cut by djb during sewer work from baba colony to amrit vihar
Strengthening of main burari road from orr to labour chowk (lhs only), labour chowk to baba colony both sides and nathupura to hirnki both sides and redevelopment of road with cc pavement cut by djb during sewer work from baba colony to amrit vihar
Read moreInterlocking tiles work on both sides of the side track from aashirwad hotel to sushila school cut in gandhinagar under city zone.
Interlocking tiles work on both sides of the side track from aashirwad hotel to sushila school cut in gandhinagar under city zone.
Read moreKtps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages
Ktps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages
Read moreKtps-vii stage - civil - o and m-i - sd-i - rectification of damaged guniting on track hopper surface of segment 2 in coal handling plant (chp) area of ktps-vii stage, paloncha, bhadradri kothagudem dist.
Ktps-vii stage - civil - o and m-i - sd-i - rectification of damaged guniting on track hopper surface of segment 2 in coal handling plant (chp) area of ktps-vii stage, paloncha, bhadradri kothagudem dist.
Read moreWork of interlocking tiles on the side tracks on both sides from gt road toilet to bajariya cut on railway road under city zone.
Work of interlocking tiles on the side tracks on both sides from gt road toilet to bajariya cut on railway road under city zone.
Read moreMadhumati nallah construction and strengthening of embankments on both sides at rd 5300 mtr and rs at rd 5600 mtr with restructuring headworks of khul at rd 5400 mtr
Madhumati nallah construction and strengthening of embankments on both sides at rd 5300 mtr and rs at rd 5600 mtr with restructuring headworks of khul at rd 5400 mtr
Read moreConstruction of interlocking tiles and drain on both sides of the side track of the road from rdc flyover (khurana mortus) to pwd quarters in city zone ward-08, maliwada.
Construction of interlocking tiles and drain on both sides of the side track of the road from rdc flyover (khurana mortus) to pwd quarters in city zone ward-08, maliwada.
Read moreIn ward-14, sec-09 e-block, work of laying drains and interlocking tiles on both sides of the road from railway road to b block jkg public school.
In ward-14, sec-09 e-block, work of laying drains and interlocking tiles on both sides of the road from railway road to b block jkg public school.
Read moreInterlocking tiles and drain repair work on both sides of the side track of the road from c/116 to c/84 in city zone ward-08, nehru nagar ii c block.
Interlocking tiles and drain repair work on both sides of the side track of the road from c/116 to c/84 in city zone ward-08, nehru nagar ii c block.
Read moreInterlocking tiles and drain repair work on both sides of the side track of the road from urvashi saree centre to siddharth homes via c/70 in city zone ward-08, nehru nagar ii c block.
Interlocking tiles and drain repair work on both sides of the side track of the road from urvashi saree centre to siddharth homes via c/70 in city zone ward-08, nehru nagar ii c block.
Read moreof your Industry type