Procurement Of Surge Lightning Arrester With Surge Monitor Er For 66 Kv Switchyard Transformer Bays At Gtps
|
| Description |
Procurement Of Surge Lightning Arrester With Surge Monitor Er For 66 Kv Switchyard Transformer Bays At Gtps.&Amp#X0d
|
| Organisation | IPGCL-PPCL | State Govt. and UT |
| Tender Id | 2025_IPGCL_274145_1 |
|
Reference Number |
1000013642/MM-IV/GTPS/25-26 |
| Tender Fee | 0 |
| EMD | 18600 |
| Tender Value | |
| Place | GTPS |
| Link |
View Original Tender Notice
https://govtprocurement.delhi.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=360603 |
| Start Date | June 21, 2025 00:15 |
| End Date |
Expired
07/07/2025
Expired 361 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Procurement, installation and commissioning of two nos. vacuum pump with replacement of existing steam jet ejectors at gtps
Procurement, installation and commissioning of two nos. vacuum pump with replacement of existing steam jet ejectors at gtps&#x0d
Read moreSupply of terminal studs with housing assembly of 420kv, 3150a, siemens make hcb isolator installed at csctpp 400kv switchyard, chhabra
Supply of terminal studs with housing assembly of 420kv, 3150a, siemens make hcb isolator installed at csctpp 400kv switchyard, chhabra
Read moreRepair/maint/renovation of chemical/copper/gi earthing of power transformer, distribution transformer vcbs, lt panels, servo voltage stabilizer, isolation transformer and connected works at af stn chabua under ge (af) chabua
Repair/maint/renovation of chemical/copper/gi earthing of power transformer, distribution transformer vcbs, lt panels, servo voltage stabilizer, isolation transformer and connected works at af stn chabua under ge (af) chabua
Read moreA)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line of sarubera colliery .
A)extension of overhead line through ab cable for illumination purpose b)installation of distribution transformer c)erection of 3.3kv ohl for installed of 315kva transformer d)renovation and erection of 440 volt head line at sarubera colliery.
Read moreErection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrrangement at topa ocp under kuju area.
Erection and reorganisation of main 11kv overhead line and installation of 1.6mva power transformer 11kv/3.3kv with ht panel at pit office substation with busbar arrangement at topa ocp under kuju area.
Read moreRepairs / maint of ht / lt electric panel, transformer, vcb etc with misc allied works at cgra naliya and icgs jakhau under ge (i) (cg) gandhinagar
Repairs / maint of ht / lt electric panel, transformer, vcb etc with misc allied works at cgra naliya and icgs jakhau under ge (i) (cg) gandhinagar
Read moreAnnual repair and maintenance of complete substations (33/11 kv and 11/0.415 kv) including all transformer, lt panel, ht panel, rmu, feeder panel etc. for one-year at iit jodhpur campus.
Annual repair and maintenance of complete substations (33/11 kv and 11/0.415 kv) including all transformer, lt panel, ht panel, rmu, feeder panel etc. for one-year at iit jodhpur campus.
Read moreCombined execution agency for facility development for upgradation of bitumen grade from vg-30 to vg-40 at haldia refinery including liaisoning with ibr authority
Combined execution agency for facility development for upgradation of bitumen grade from vg-30 to vg-40 at haldia refinery including liaisoning with ibr authority.
Read moreConstruction of skywalk with travelators at anand vihar multimodal hub for seamlessly connectivity between anand vihar railway station to isbt, kuashambi. for complete work details (please refer ifb).
Construction of skywalk with travelators at anand vihar multimodal hub for seamlessly connectivity between anand vihar railway station to isbt, kuashambi. for complete work details (please refer ifb).
Read moreSelection of agency for construction, operation, maintenance and management of group toilet at new bus stand, ramgarh cantonment on public-private partnership (ppp) mode with revenue sharing
Selection of agency for construction, operation, maintenance and management of group toilet at new bus stand, ramgarh cantonment on public-private partnership (ppp) mode with revenue sharing
Read moreof your Industry type