Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of High Level Bridge At Km.0/6 Of Pachakuppam Alinjikuppam Road Across Palar River In Lieu Of Existing Causeway
|
| Description |
Construction Of High Level Bridge At Km.0/6 Of Pachakuppam Alinjikuppam Road Across Palar River In Lieu Of Existing Causeway
|
| Organisation | Government of Tamil Nadu |
| Tender Id | 2023_HWAY_331275_1 |
|
Reference Number |
TN.No.15/SI.No.01/ 2023-2024 / SDO |
| Tender Fee | 0 |
| EMD | 8.99 Lakh |
| Tender Value | |
| Place | Off SEHNRR Chengalpattu |
| Link |
View Original Tender Notice
https://tntenders.gov.in |
| Start Date | July 12, 2023 15:00 |
| End Date |
Expired
11/08/2023
Expired 1074 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Tender for construction improvement of existing rd sktt cl 9 to nhdl specn from km 0pt00 to km 30pt645 design chainage km 0pt00 to km 30pt370 net length 30pt370 km under 94 rcc 38 tf pjt dpk in hp
Read moreDevelopment of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Development of link connector corridor between nh-19 and varanasi ring road with riverbank connectivity along river ganga for decongestion of varanasi city pkg 1 from km 0.000-km7.926 (tl 20.00km mcw loop ramp link road) in up on ham
Read moreConstruction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.
Read moreConstruction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.
Read moreConstruction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).
Read moreConstruction of high level bridge across thirumanimutharu river at km 0/8 of elupuli - elayampalayam road in lieu of existing causeway
Construction of high level bridge across thirumanimutharu river at km 0/8 of elupuli - elayampalayam road in lieu of existing causeway
Read moreConstruction of high level bridge across thenpennaiyar river in lieu of existing causeway at km72/0 -72/6 of cuddalore - chittor road.
Construction of high level bridge across thenpennaiyar river in lieu of existing causeway at km72/0 -72/6 of cuddalore - chittor road.
Read moreConstruction of high level bridge at km 0/2 of kongarayanur paiyur colony road across thenpennaiyar river in lieu of existing causeway
Construction of high level bridge at km 0/2 of kongarayanur paiyur colony road across thenpennaiyar river in lieu of existing causeway
Read moreConstruction of high level bridge at km 2/8 of thiruvalam katpadi venkatagiri kottah road to sedhuvalai (via) virinjipuram road across palar river in lieu of existing causeway
Construction of high level bridge at km 2/8 of thiruvalam katpadi venkatagiri kottah road to sedhuvalai (via) virinjipuram road across palar river in lieu of existing causeway
Read moreConstruction of high level bridge in lieu of existing causeway across kallar river at km 13_2 of arakkonam_ocheri road sh_126
Construction of high level bridge in lieu of existing causeway across kallar river at km 13_2 of arakkonam_ocheri road sh_126
Read moreof your Industry type