Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Sri Rama Sagar Project Ii
|
| Description |
Repair To Cross Regulator At Km.310.630 On Kakatiya Main Canal Of Srsp Stage Ii
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 697973 |
|
Reference Number |
03/2026-27, Dated: 10.04.2026. |
| Tender Fee | 350 |
| EMD | 9861 |
| Tender Value | - |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | May 01, 2026 16:30 |
| End Date |
Expired
14/05/2026
Expired 135 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Restoration and comprehensive development of fox sagar (phase-i) by the o/o commissioner, hydraa
Restoration and comprehensive development of fox sagar (phase-i) by the o/o commissioner, hydraa
Read moreReconstruction / renovation of sri ambha bhavani temple, ellikatta (v), farooqnagar (m), rangareddy district
Reconstruction / renovation of sri ambha bhavani temple, ellikatta (v), farooqnagar (m), rangareddy district
Read moreUpgradation of sri jayadeva hospital 400 bed to 600 bed at sjicsr campus krs road, mysuru.
Upgradation of sri jayadeva hospital 400 bed to 600 bed at sjicsr campus krs road, mysuru.
Read moreTender for sale of mig houses at ganga nagar project
Tender for sale of mig houses at ganga nagar project
Read moreProcurement of 9 m stepped tubular lighting poles for pkoc project,manuguru area -reg.
Procurement of 9 m stepped tubular lighting poles for pkoc project,manuguru area -reg.
Read moreSupply of type-ii ndx fully built 400 mofussil buses to kkrtc
Supply of type-ii ndx fully built 400 mofussil buses to kkrtc
Read moreTggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Tggenco-btps-stage-ii-unit.no.4-annual overhaul of tg set during the scheduled unit overhaul for the fy2026-27.
Read moreDrilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.
Read moreSupply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.
Read moreSupply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.
Read moreof your Industry type