Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repair And Overhauling Service Removal Preparation And Fitment Of Gt Gtg Main Air Intake Rubber D
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/R/289673 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | January 13, 2024 16:30 |
| End Date |
Expired
16/01/2024
Expired 1003 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
DEVNAM PIYADASSI BRIXWELL PRIVATE LIMITEDVinayak EnterprisesDD ENTERPRISESOFFICE...
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | PACIFIC MARINE SERVICES | Item Categories : Repair and Overhauling Service - REMOVAL PREPARATION AND FITMENT OF GT GTG MAIN AIR INTAKE RUBBER D | 550000.00 | L1 |
| 2 | ELITE ENGINEERING ENTERPRISES | Item Categories : Repair and Overhauling Service - REMOVAL PREPARATION AND FITMENT OF GT GTG MAIN AIR INTAKE RUBBER D | 767088.00 (Bid Price) | L2 |
| 3 | T D ENGINEERING ENTERPRISES | Item Categories : Repair and Overhauling Service - REMOVAL PREPARATION AND FITMENT OF GT GTG MAIN AIR INTAKE RUBBER D | 840672.00 (Bid Price) | L3 |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| Crompton Briz Air Deco 1200mm Lustre Brown | crompton | Crompton Briz Air Deco 1200mm Lustre Brown | 12 | ₹ 28800.000 |
| NOTICE BOARD | NA | NA | 4 | ₹ 4600.000 |
| Samsung MLT-D203S Black Toner Cartridge | SAMSUNG | Samsung MLT-D203S Black Toner Cartridge | 60 | ₹ 333600.000 |
| file cover with printing | AU | file cover with printing | 300 | ₹ 3000.000 |
| SIMMTRONICS 2GB | Simmtronics | SIMMTRONICS 2GB DDR2 | 14 | ₹ 14000.000 |
| File Tag Green | Unbranded | File Tag Green-v18 | 372 | ₹ 49848.000 |
| Microsoft Officestd 2016 SNGL OLP C | Microsoft | Microsoft & Officestd 2016 SNGL OLP C | 1 | ₹ 14800.000 |
| Electrical Wire 4mm Bundle 90M | finolex | 4m-CU-AL | 6 | ₹ 37800.000 |
| SURF EXCEL EASY WASH | surf excel | SURF EXCEL BLUE | 15 | ₹ 1638.750 |
| MULTIMEDIA PROJECTOR | Hitachi | HITACHI CP-X2542WN | 1 | ₹ 37280.000 |
| hp desktop | hp | HP Slimline 270-p020il | 2 | ₹ 64798.000 |
| GODREJ COMPUTER TABKE C11 | GODREJ INTERIO | GODREJ COMPUTER TABKE C11 | 2 | ₹ 17560.000 |
| CDMA Trainer | Tatame | Tatame TTCDMATR | 1 | ₹ 49990.000 |
| MEDICAL REIMBURSEMENT CLAIM FORM | PARAS | PARAS MEDICAL REIMBURSEMENT CLAIM FORM | 10 | ₹ 950.000 |
| best and more reliable weighing scale | Omron | hn289 omron | 25 | ₹ 49999.750 |
| Carrier split AC | Carrier | CAS18DF3N8F0/2018 | 1 | ₹ 37850.000 |
| File wrapper or flap | NA | wrapper | 600 | ₹ 2580.000 |
| file cabinet four drawer (NV) | N.V. | NV-FC-001 | 1 | ₹ 8900.100 |
| HP 204A Cyan LaserJet Toner Cartridge CF511A | hp | HP 204A Cyan LaserJet Toner Cartridge CF511A | 2 | ₹ 6986.000 |
| HP 204A Yellow LaserJet Toner Cartridge CF512A | hp | HP 204A Yellow LaserJet Toner Cartridge CF512A | 2 | ₹ 6986.000 |
Solenoid valves with coil for gt air intake filter cleaning system
Solenoid valves with coil for gt air intake filter cleaning system
Read moreWork services for pme, rubber removal and paint removal at af stn kumbhirgram.
Work services for pme, rubber removal and paint removal at af stn kumbhirgram.
Read moreGt-ache- overhauling of air cooled heat exchanger fan # 5 and 6
Gt-ache- overhauling of air cooled heat exchanger fan # 5 and 6
Read moreMtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc
Mtps i m i ca cws i unit ii overhauling of 1600 mm bfv including actuator gb overhauling checking and renewal of nitrile rubber seal painting of intake screen of cooling water pumps 2a 2b and 2c etc
Read moreVarious maintenance works of transformers gt-6, uat- 6a and 6b, st-5 and st-1 under emoph, stps during upcoming overhauling of u-6.
Various maintenance works of transformers gt-6, uat- 6a and 6b, st-5 and st-1 under emoph, stps during upcoming overhauling of u-6.
Read moreRepair and overhauling service - rate contract for erection removal maintenance of scaffolding staging steel stages in vessels any other suitbale brand no buyer premises
Repair and overhauling service - rate contract for erection removal maintenance of scaffolding staging steel stages in vessels any other suitbale brand no buyer premises
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - onboard in ships rate contract of removal overhaul and fitment of underwater valves, size – (125 mm and above) type – nrp/sdnr for two years – in ships service provide..
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - onboard in ships rate contract of removal overhaul and fitment of underwater valves, size – (125 mm and above) type – nrp/sdnr for two years – in ships service provide..
Read moreMaintenance and repairs to iron removal plant and other misc repairs cleaning to water supply installation and emergency repairs and overhauling servicing maintenance of mes b vehicles under ge missamari
Maintenance and repairs to iron removal plant and other misc repairs cleaning to water supply installation and emergency repairs and overhauling servicing maintenance of mes b vehicles under ge missamari
Read moreTtps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027
Ttps operation circle cad cwph i unit iii annual overhauling of tw screen 3a to 3d complete silt removal from pump suction end to tw screen channel entry gate for the year 2026 to 2027
Read moreMobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Mobilization and demobilization of manpower tools and tackles welding machine gas cutting scaffolding materials and other necessary equipment to site,dismantling removal of existing old damaged and rusted trash rack including cutting lifting handling and disposal as directed by eic,preparation of fabrication shop drawings based on departmental design drawings supply of structural steel fabrication,underwater inspection and cleaning of intake area before erection of new trash rack including detailed site inspection prior to preparation of fabrication drawings and furnishing of photographs etc,providing and applying one coat of metal primer and two coats of anti corrosive epoxy paint on fabricated trash rack,testing inspection and commissioning of newly installed trash rack including rectification of defects if any
Read moreof your Industry type