Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of The 10 Inch Dia Foot Valves, 8 Inch Dia Non Return Valves And 8 Inch Dia Sluice Valve, Making Of Nipple And Onsite Testing And Commissioning It With The Three Nos. Of 2000 G.P.M. Pumps In Operation In Mine, Under Karo Ocp, Bn K Area
|
Description |
Repairing Of The 10 Inch Dia Foot Valves, 8 Inch Dia Non Return Valves And 8 Inch Dia Sluice Valve, Making Of Nipple And Onsite Testing And Commissioning It With The Three Nos. Of 2000 G.P.M. Pumps In Operation In Mine, Under Karo Ocp, Bn K Area
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_330623_1 |
Reference Number |
P.E. (EnM)/ Karo OCP/ e-tender/ 2024-25/ 114 |
Tender Fee | 0 |
EMD | 2600 |
Tender Value | |
Place | KARO OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342721 |
Start Date | February 28, 2025 16:30 |
End Date |
10/03/2025 ( Expired 42 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Read moreDismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Dismantling and di cum laying of 8 inch dia m.s. pipeline of the two nos. of 2000 g.p.m. pump motor sets, in the a patch in mine, suppplying water to the water tanker point, w.r.t. karo ocp, under bnk area
Read moreMaking of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Making of portable sheds, with internal electric wiring for the three nos. of 2000 g.p.m. pump motor sets, installed in mine, w.r.t. karo ocp, bnk area
Read moreDismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area
Dismantling and di cum erection of the 3.3 kv oh line for feeding power to the new proposed location of the 2000 g.p.m. pump motor at the h patch, in mine, w.r.t. karo ocp, under bnk area
Read moreDismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Dismantling, repairing and laying of the 8 inch dia m.s. pipes of the delivery pipeline of the 2000 g.p.m. pump motor set, in operation at the h patch in mine, w.r.t. karo ocp, under bnk area
Read moreMaking pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area
Making pump foundations and laying of 3.3 kv cable required for installation of two nos. of 2000 g.p.m. pump motor sets, at the a patch, w.r.t. karo ocp, under bnk area
Read moreFabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of nr valve and foot valve for operation of 1300 gpm and 2000 gpm pump at jehlitand sump under kdh ocp, nk area
Fabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of nr valve and foot valve for operation of 1300 gpm and 2000 gpm pump at jehlitand sump under kdh ocp, nk area
Read moreComplete repairing and testing of different sizes of sluice valve and non- valve (12 inch,10 inch and 8 inch) at amlohri project
Complete repairing and testing of different sizes of sluice valve and non- valve (12 inch,10 inch and 8 inch) at amlohri project
Read moreRepair of the damaged 8 inch dia m.s. pipes to make full length pipes, needed for use in mine, w.r.t. karo ocp, under bnk area
Repair of the damaged 8 inch dia m.s. pipes to make full length pipes, needed for use in mine, w.r.t. karo ocp, under bnk area
Read moreRepairing of the 10 inch dia foot valves, 8 inch dia non return valves and 8 inch dia sluice valve, making of nipple and onsite testing and commissioning it with the three nos. of 2000 g.p.m. pumps in operation in mine, under karo ocp, bnk area
Repairing of the 10 inch dia foot valves, 8 inch dia non return valves and 8 inch dia sluice valve, making of nipple and onsite testing and commissioning it with the three nos. of 2000 g.p.m. pumps in operation in mine, under karo ocp, bnk area
Read moreof your Industry type