Tender Details

Particulars Details
Title
Construction Of Pump House And Tail Regulator For Flood Protection Works At Rd 00 Of Bali Link Drain Outfall At Rd 209975/L Of Drain No.8.
Description
Construction Of Pump House And Tail Regulator For Flood Protection Works At Rd 00 Of Bali Link Drain Outfall At Rd 209975/L Of Drain No.8.
Organisation Government of Haryana
Tender Id 2023_HRY_301739_1
Reference
Number
20231AD8BB9F D1BE 4E0C 911C 35C5624CAD022000IRR
Tender Fee 15000
EMD 2.15 Lakh
Tender Value -
Place Const. Divn. No. 30, Gohana
Link
View Original Tender Notice

https://etenders.hry.nic.in

Start Date August 04, 2023 22:30
End Date
Expired 26/08/2023

Expired 1146 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Estimate for repair of dholan disty head regulator gate offtaking rd 126000/l of abohar

Estimate for repair of dholan disty head regulator gate offtaking rd 126000/l of abohar

Read more
Estimate for construction of head regulator of new tarmala link channel off taking at rd 76000/r of lambi distributary

Estimate for construction of head regulator of new tarmala link channel off taking at rd 76000/r of lambi distributary

Read more
Estimate for removal of muck to revive the capacity of mb link head regulator at rd 11000 of main line ubdc

Estimate for removal of muck to revive the capacity of mb link head regulator at rd 11000 of main line ubdc

Read more
Estimate for clearance internal section (weed, jalla, deela, sarkanda, jungle butti, dhorra, silts etc.) manually from inner section of link channel rd 0-17590 (head to tail)

Estimate for clearance internal section (weed, jalla, deela, sarkanda, jungle butti, dhorra, silts etc.) manually from inner section of link channel rd 0-17590 (head to tail)

Read more
R/r of damages on link road to village saintari in km 0/00 to 0/300 p/l m/t work portion km 0/00 to 0/300

R/r of damages on link road to village saintari in km 0/00 to 0/300 p/l m/t work portion km 0/00 to 0/300

Read more
Construction of flood protection walls including guide parapet walls along low lying areas and other critical spots from harwan rd 500 m to tailbal 5000 m

Construction of flood protection walls including guide parapet walls along low lying areas and other critical spots from harwan rd 500 m to tailbal 5000 m

Read more
Flood damage repair fdr protection of kamalapur village near l i scheme from erosion of right side bank of deo river under pecharthal adc village of pecharthal rd block under wr sub division kanchanpur north tripura during the year 2026 2027 s

Flood damage repair fdr protection of kamalapur village near l i scheme from erosion of right side bank of deo river under pecharthal adc village of pecharthal rd block under wr sub division kanchanpur north tripura during the year 2026 2027 s

Read more
P and l of 75 mm tk wmm each in two layers km 00 to km 3pt000 75 mm tk dbm and 40 mm tk bc for surf rd surface aply pc and tc and rd mrkng bet km 00 to km 2pt500 all as per particular morth specification on pong op hill rd

P and l of 75 mm tk wmm each in two layers km 00 to km 3pt000 75 mm tk dbm and 40 mm tk bc for surf rd surface aply pc and tc and rd mrkng bet km 00 to km 2pt500 all as per particular morth specification on pong op hill rd

Read more
A/r and m/o on brahman majra link road in km 0/0 to 1/600 (sh p/l patch work b.c in km 0/00 to 1/600).

A/r and m/o on brahman majra link road in km 0/0 to 1/600 (sh p/l patch work b.c in km 0/00 to 1/600).

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise