Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Rectification Works To The Damaged Pedestals And Providing Encasing Concrete To The Structural Steel Columns Along Pipe Rack Pr 3 From Bottom Ash Hopper Of Unit 4 Upto Pa Fan 4 B
|
| Description |
Rectification Works To The Damaged Pedestals And Providing&Amp#X0d
Encasing Concrete To The Structural Steel Columns Along Pipe&Amp#X0d
Rack Pr 3 From Bottom Ash Hopper Of Unit 4 Upto Pa Fan&Amp#X0d
4 B
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_582353_1 |
|
Reference Number |
CE SE C TTPS Spec No.186 25 26 |
| Tender Fee | 0 |
| EMD | 8600 |
| Tender Value | - |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=695856 |
| Start Date | July 16, 2025 23:30 |
| End Date |
Expired
31/07/2025
Expired 441 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Rectification of existing pa fan motor concrete bed of unit 1 1b and dismantling partition wall in between mill floor and bottom ash hopper of unit 1
Read moreKtps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Ktps-v- cam- strengthening of supporting columns of feed gate 10a and 10b and laying of painting over the bottom ash hopper peripheral area and its associated structural steel members of unit-10 in the year 2026-2027.-reg
Read moreTtps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Ttps mechii ahp painting of unitiii bottom ash hopper body plate and its connected structural supports from 0 mtr to 6 mtr el during the forthcoming annual overhaul
Read moreProcurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Read moreTggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Tggenco-ytps(5x800mw)-bop-iii-supply of grinder housing of clinker grinders and air cylinder(14 inche bore x 38 inche stroke) assemblies of feed gates for bottom ash hopper in ash handling system.
Read moreRepair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - overhauling work of bottom ash hopper system and dfa system of unit no 10 btps obra power house equipment service provider
Read moreTtps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Ttps mechii ahp unitiii attending overhauling works in unit iii eco aph hoppers ash disposal system flushing apparatus rubber expansion bellow and allied sea water pipe lines fittings valves and rectification work in aph hopper platforms and d
Read moreRectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 3 from pa fan 4b upto mill plant operator room
Rectification works to the damaged pedestals and providing&#x0d encasing concrete to the structural steel columns along pipe&#x0d rack pr 3 from pa fan 4b upto mill plant operator room
Read moreRectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 3 along west side of unit 5 bottom ash hopper up to mill operator room
Rectification works to the damaged pedestals and providing&#x0d encasing concrete to the structural steel columns along pipe&#x0d rack pr 3 along west side of unit 5 bottom ash hopper up&#x0d to mill operator room
Read moreDismantling the damaged pedestals and providing encasing concrete to the structural steel columns in mill area to the east of bottom ash hopper up to mill bay in unit 5 area
Dismantling the damaged pedestals and providing encasing concrete to the structural steel columns in mill area to the east of bottom ash hopper up to mill bay in unit 5 area
Read moreof your Industry type