Tender Details

About Tender

🏭 Tender Announcement: Structural Steel Column Encasing Project 🏗️ Tneb Limited, A State Government Undertaking, Is Seeking Bids For The Dismantling Of Damaged Pedestals And The Provision Of Encasing Concrete To Structural Steel Columns In The Mill Area To The East Of The Bottom Ash Hopper Up To Mill Bay In Unit 5. This Project Is Located At Ttps. 📅 Bid Submission Deadline: July 15, 2024, 2:00 Pm Interested Bidders Are Required To Submit An Earnest Money Deposit (Emd) Of Inr 81,000. No Tender Fee Is Applicable. Detailed Bids, Including Method Statements, Safety Plans, And Compliance With Environmental And Safety Regulations, Are Expected. Keywords: Tneb Limited, Structural Steel Columns, Dismantling, Encasing Concrete, Ttps, State Govt. And Ut, Tender, Project Bid
Particulars Details
Title
Dismantling The Damaged Pedestals And Providing Encasing Concrete To The Structural Steel Columns In Mill Area To The East Of Bottom Ash Hopper Up To Mill Bay In Unit 5 Area
Description
Dismantling The Damaged Pedestals And Providing Encasing Concrete To The Structural Steel Columns In Mill Area To The East Of Bottom Ash Hopper Up To Mill Bay In Unit 5 Area
Organisation TNEB Limited | State Govt. and UT
Tender Id 2024_EB_458007_1
Reference
Number
CE SE C TTPS Spec. No 124 24 25
Tender Fee 0
EMD 8100
Tender Value -
Place TTPS
Link
View Original Tender Notice

https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=544485

Start Date June 28, 2024 23:30
End Date
Expired 15/07/2024

Expired 781 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of a pcc (cement concrete) surface in ward no. 15 (baijnathpur), extending from the wazirganj-fatehpur road to the area near the bridge.

Construction of a pcc (cement concrete) surface in ward no. 15 (baijnathpur), extending from the wazirganj-fatehpur road to the area near the bridge.

Read more
Grass and bushes cutting work in switchyard and campus area of 132/33 kv gss, barhait under transmission division, lalmatia for the period 16.09.2026 to 31.03.2027

Grass and bushes cutting work in switchyard and campus area of 132/33 kv gss, barhait under transmission division, lalmatia for the period 16.09.2026 to 31.03.2027

Read more
Dismantling the damaged pedestals and providing encasing concrete to the structural steel columns in boiler area to the east of bottom ash hopper up to mill bay in unit 5 area

Dismantling the damaged pedestals and providing encasing concrete to the structural steel columns in boiler area to the east of bottom ash hopper up to mill bay in unit 5 area

Read more
Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 3 along west side of unit 5 bottom ash hopper up to mill operator room

Rectification works to the damaged pedestals and providing&amp#x0d encasing concrete to the structural steel columns along pipe&amp#x0d rack pr 3 along west side of unit 5 bottom ash hopper up&amp#x0d to mill operator room

Read more
Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 3 from bottom ash hopper of unit 4 upto pa fan 4b

Rectification works to the damaged pedestals and providing&amp#x0d encasing concrete to the structural steel columns along pipe&amp#x0d rack pr 3 from bottom ash hopper of unit 4 upto pa fan&amp#x0d 4b

Read more
Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 3 from pa fan 4b upto mill plant operator room

Rectification works to the damaged pedestals and providing&amp#x0d encasing concrete to the structural steel columns along pipe&amp#x0d rack pr 3 from pa fan 4b upto mill plant operator room

Read more
Improvement works by replacing the damaged pedestals and providing encasing concrete to the structural steel columns in esp 4 main columns a b and c d path

Improvement works by replacing the damaged pedestals and&amp#x0d providing encasing concrete to the structural steel columns in esp 4 main columns a b and c d path

Read more
Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 4 support columns in unit 4 esp to chimney 3 along east side of trench

Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe&amp#x0d rack pr 4 support columns in unit 4 esp to chimney 3 along east side of trench

Read more
Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack pr 4 support columns in unit 4 esp to chimney 3 along west side of trench

Rectification works to the damaged pedestals and providing&amp#x0d encasing concrete to the structural steel columns along pipe&amp#x0d rack pr 4 support columns in unit 4 esp to chimney 3&amp#x0d along west side of trench

Read more
Rectification works to the damaged pedestals and providing encasing concrete to the structural steel columns along pipe rack (pcr 5) support columns from unit 3 compound wall to esp 4 rear side up to chimney 3

Rectification works to the damaged pedestals and providing&amp#x0d encasing concrete to the structural steel columns along pipe&amp#x0d rack (pcr 5) support columns from unit 3 compound wall&amp#x0d to esp 4 rear side up to chimney 3

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise