Tender Details

About Tender

๐Ÿš—๐Ÿš– Urgent: Cab And Taxi Hiring Service For Su Vs Diesel Hard Top Jeep Non Ac ๐Ÿš™ The Ministry Of Power, Through Its Contracts And Materials Department, Is Seeking Bids For The Monthly Hiring Of Su Vs, Specifically Diesel Driven Hardtop Jeeps Without Air Conditioning. ๐Ÿ“… Bid Submission Deadline: June 11, 2024, 11:00 Am Service Providers Are Requested To Submit Detailed Proposals, Including Rates, Terms Of Service, And Operational Capabilities, For The Provision Of Cab And Taxi Services On A Monthly Basis. Keywords: Cab And Taxi Hiring Service, Suv, Diesel, Hard Top Jeep, Non Ac, Ministry Of Power, Government Contract
Particulars Details
Title
Monthly Basis Cab And Taxi Hiring Service Without Fuel Suv; Diesel Driven Hard Top Jeep Non Ac E
Description
Organisation Contracts and Materials | Ministry of Power
Tender Id GEM/2024/B/4920325
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date May 14, 2024 15:47
End Date
Expired 11/06/2024

Expired 853 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: 3 Lakhs Experience with Gov. Required: Years Project Experience Required: Yes
Buyer Name: Debmalya Saha
Ministry: Ministry Of Power
Department: Contracts And Materials
Organisation: Damodar Valley Corporation

Technical Evaluation Results

S.No. Seller Name Participated On EMD Status MSE/MII Status Status
1 Almighty Manpower & Security Services 11-06-2024 09:57:55 Central / State PSUs MSE Disqualified
2 Angel Manpower & Security Services 11-06-2024 09:45:06 Central / State PSUs N/A Disqualified
3 BALAJI EARTH MOVERS 10-06-2024 19:18:04 Registered with designated Agency / Authority MSE Qualified
4 FRIENDS ENTERPRISE 10-06-2024 19:32:54 Registered with designated Agency / Authority MSE Qualified
5 INFINIDEA TECHNOLOGIES AND SOLUTIONS PRIVATE LIMITED 11-06-2024 09:04:00 Start-up MSE Disqualified
6 KING AND ANGEL DIAMOND SERVICES PRIVATE LIMITED 11-06-2024 09:46:11 Central / State PSUs MSE Disqualified
7 PINAKINE SECURE SECURITY SOLUTIONS 11-06-2024 10:12:30 Central / State PSUs N/A Disqualified
8 SAFE SHADOW SECURITY SERVICES 11-06-2024 09:51:46 Central / State PSUs MSE Disqualified
9 Sky High Secure Security Services 11-06-2024 09:59:12 Central / State PSUs MSE Disqualified
10 SMVD Group Secure Services 11-06-2024 09:53:26 Central / State PSUs MSE Disqualified
11 SRI KRISHNA ENTERPRISE 10-06-2024 19:56:55 Registered with designated Agency / Authority MSE Qualified
12 TRIPATHI BROTHERS SERVICES 11-06-2024 10:16:46 Central / State PSUs MSE Disqualified
13 TRIPATHI BROTHERS SERVICES PRIVATE LIMITED 11-06-2024 09:59:30 Central / State PSUs MSE Disqualified
14 VAIKUNTH GROUP ENTERPRISES 11-06-2024 10:03:34 Central / State PSUs MSE Disqualified
15 Z2 PLUS PLACEMENT & SECURITY AGENCY PRIVATE LIMITED 01-06-2024 19:50:03 MSE MSE Disqualified
Similar Tenders
Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in

Drilling, excavation, loading, transportation, dumping, spreading and leveling etc., of 651.097 lbcm of in-situ ob (which includes 15.317 lbcm of top soil, 30.607 lbcm of sub-soil, 537.760 lbcm of hard ob, 66.753 lbcm of coal and 0.660 lbcm of top soil quantity beneath the dump) with conventional equipment and additional works viz., 5000 shovel hours, 5000 dozer hours and 1,30,000 rmt of drilling at jawahar khani opencast mine [amalgamation of jk-5 ocp and 21 incline (conversion of 21 incline in to oc)], yellandu area for a period of 48 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 380.876 lbcm of in-situ ob (which includes 4.037 lbcm of top soil, 4.037 lbcm of sub soil, 355.469 lbcm of hard ob, 17.333 lbcm of coal), excavation of 0.614 lbcm of top soil beneath the external dump, excavation of 10.403 lbcm of in-situ ob for permanent diversion of gundlavagu nallah, excavation of 0.732 lbcm of ob for temporary diversion of gundlavagu nallah, re-handling of 1.849 lcm of loose ob, and re-handling of 1.807 lcm of loose top soil for permanent diversion of gundlavagu nallah with conventional equipment, and additional works viz., 4000 shovel hours, 3000 dozer hours and 1,80,000 rmt of drilling at ktk oc-iii project, bhupalpally area during a period of 36 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 219.120 lbcm of in-situ ob (which includes 185.745 lbcm of hard ob, 33.375 lbcm of coal), and re-handling of 7.550 lcm of top soil with conventional equipment, and additional works viz., 4000 shovel hours, 2000 dozer hours and 50,000 rmt of drilling at kistaram opencast project, sathupally area during a period of 24 months.

Read more
Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Drilling, excavation, loading, transportation, dumping, spreading and levelling, etc., of 958.370 lbcm of in-situ ob (which includes 2.440 lbcm of top soil, 4.880 lbcm of sub soil, 869.900 lbcm of hard ob and 81.150 lbcm of coal) with conventional equipment and additional works viz., 4,000 shovel hours, 4,000 dozer hours and 1,00,000 rmt of drilling at rg oc-iii expansion mine, rg-ii area, during a period of 48 months.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise