Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🛠️ Procurement Opportunity: Excavation Services 🌱 The Department Of Military Affairs, Ministry Of Defence, Is Seeking Bids For Excavation Services In Trenches With A Width Of 1.5 Meters And A Depth Of 1.5 Meters. 🌱 🗓️ Deadline: July 17, 2024, 3:00 Pm Interested Contractors Must Provide Detailed Bids, Including Methodology, Equipment, Safety Measures, And Timelines For Project Completion. Keywords: Excavation, Trenching, Military, Government Procurement, Department Of Military Affairs, Ministry Of Defence| Particulars | Details |
|---|---|
| Title |
Excavation In Trenches Not Exc 1 Point 5 Metre Wide And Not Exc 1 Pt 5 Metre In Depth,Returning Com
|
| Description |
|
| Organisation | Department of Military Affairs | Ministry of Defence |
| Tender Id | GEM/2024/B/5081859 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | June 26, 2024 19:41 |
| End Date |
Expired
17/07/2024
Expired 818 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | RACHNA ENTERPRISES | - | 10-07-2024 13:34:45 | MII MSE | Qualified |
| 2 | Shree Bhagwati Enterprises | - | 10-07-2024 13:29:22 | MII MSE | Qualified |
| 3 | SHREE SANWALIYA BUILDERS | - | 10-07-2024 13:23:39 | MII MSE | Qualified |
Financial Evaluation Results
| S.No. | Seller Name | Offered Item | Total Price | Rank |
|---|---|---|---|---|
| 1 | SHREE SANWALIYA BUILDERS( MSE Social Category:General ) | Item Categories : Excavation in trenches not exc 1 point 5 metre wide and not exc 1 pt 5 metre in depth,Returning com | 73150.00 | L1 |
| 2 | RACHNA ENTERPRISES( MSE Social Category:ST ) | Item Categories : Excavation in trenches not exc 1 point 5 metre wide and not exc 1 pt 5 metre in depth,Returning com | 86870.00 | L2 |
| 3 | Shree Bhagwati Enterprises( MSE Social Category:General ) | Item Categories : Excavation in trenches not exc 1 point 5 metre wide and not exc 1 pt 5 metre in depth,Returning com | 107080.00 | L3 |
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr
Read moreExcavation in trenches not exc 1 point 5m wide,returning filling in soil including spreading leveli
Read more
Excavation in trenches not exceeding 1500 cm wide and not exc 1500 cm in deep pipe line,returning a
Read more
Excavating in trenches not exc. 1.50 mtr wide and not exc. 1.50 mtr in depth getting out in soft lo
Read more
Excavating in trenches not exc. 1.50 mtr wide and not exc. 1.50 mtr in depth, getting out in soft l
Read more
Excavation in trenches not exceeding 1 point 5 m wide and not exc 1 point 5m deep,excavation in tre
Read more
Excavation in trenches soil not exceeding 15 milimeter wide and not exceeding 15 milimeter in depth
Read more
of your Industry type